Project Name: Sanitary Sewer Trenchless Point Repair
<br /> Engineer's Estimate ele Scan,Inc. National Power Rodding alden Associated Hcerr Construction,Inc. Pipe Cleaning Corp.
<br /> Project Number: 05-29 6275 E.Rt.36 Corp. Technologies,Inc. PO Box 10195 7277 Bessemer Ave.
<br /> Decatur,IL 62521 500 W.Arthington St. PO Boz 845 Peoria,IL 61612 Cleveland,OH 44127
<br /> City Engineering Division Chicago,IL 60612 Glen Carbon,IL 62034
<br /> Bid Date: Friday,December 23,2005
<br /> ime: 10:00 A.M.
<br /> Fund: SewerFund
<br /> Organization Code: 79487906
<br /> ObJect Code: 461300
<br /> Item Pay Item QTY Unit Unit Price Total Unit Price Total Unit Price Total Unit Price Total Unit Price Total Unit Price Total
<br /> Number
<br /> 1 RENCHLESS POINT REPAIR,15 INCH 4 FT $375.00 $1,500.00 $375.00 $1,500.00 $595.00 $2,380.00 $862.00 $3,448.00 $670.00 $2,680.00 $643.75 $2,575.00
<br /> 2 RENCHLESS POINT REPAIR,12 INCH 24 FT $360.00 $8,640.00 $360.00 $8,640.00 $581.14 $13,947.36 $612.00 $14,688.00 $600.00 $14,400.00 $524.00 $12,576.00
<br /> 3 RENCHLESS POINT REPAIR,10 INCH 36 FT $345.00 $12,420.00 $345.00 $12,420.00 $464.86 $16,734.96 $559.00 $20,124.00 $550.00 $19,800.00 $545.00 $19,620.00
<br /> 4 RENCHLESS POINT REPAIR,8 INCH 162 FT $300.00 $48,600.00 $300.00 $48,600.00 $459.16 $74,383.92 $559.00 $90,558.00 $500.00 $81,000.00 $432.00 $69,984.00
<br /> 5 RENCHLESS POINT REPAIR,6 INCH 12 FT $275.00 $3,300.00 $275.00 $3,300.00 $456.88 $5,482.56 $559.00 $6,708.00 $525.00 $6,300.00 $613.00 $7,356.00
<br /> 6 SANITARY SEWER LATERAL RECONNECTION 16 EA $250.00 $4,000.00 $250.00 $4,000.00 $450.00 $7,200.00 $250.00 $4,000.00 $400.00 $6,400.00 $250.00 $4,000.00
<br /> 7 IDEOINSPECTION 51 EA $250.00 $12,750.00 $0.00 $0.00 $200.00 $10,200.00 $718.52 $36,644.52 $235.00 $11,985.00 $705.00 $35,955.00
<br /> 8 FINAL PROJECT REPORT 1 LS $350.00 $350.00 $0.00 $0.00 $700.00 $700.00 $200.00 $200.00 $1,300.00 $1,300.00 $1,500.00 $1,500.00
<br /> 9 N CALL MOBILIZATION 5 EA $850.00 $4,250.00 $0.00 $0.00 $2,600.00 $13,000.00 $500.00 $2,500.00 $3,500.00 $17,500.00 $5,500.00 $27,500.00
<br /> �������,�������
<br /> OTAL BIDS(AS CORRECTED) ��� $95,810.00� $78,460.00 C� $144,028.80� $178,870.52� $161,365.00� $181,066.00
<br /> Percent Over Under ENGINEER'S ESTIMATE ����� -18.11% C� 50.33% � 86.69% � 68.42% � 88.98%
<br /> � c�;� /Z - z �-o s
<br /> Matthew C. Newell, P.E.,City Engineer Date