My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
R2005-189 APPROVING AGREEMENT AMENDMENT
COD
>
City Clerk
>
RESOLUTIONS
>
2005
>
R2005-189 APPROVING AGREEMENT AMENDMENT
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/7/2015 2:27:05 PM
Creation date
12/7/2015 2:27:05 PM
Metadata
Fields
Template:
Resolution/Ordinance
Res Ord Num
R2005-189
Res Ord Title
APPROVING AGREEMENT AMENDMENT WITH BLANK, WESSELINK, COOK & ASSOCIATES, INC.
Approved Date
12/19/2005
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
BLANK , WESSELINK , COOK & ASSOCIATES , INC . <br /> . HARRY M.COOK <br /> . ROseei M.D� <br /> JOSEPH D.CYCOTfE <br /> A R C H 1 T E C T S <br /> E N G I N E E R S SCOTT D.RIGNTER <br /> BWC#009-0503 F/C 3.1 <br /> December 6, 2005 <br /> City of Decatur <br /> Doug Nooden <br /> Assistant City Engineer <br /> #1 Gary K. Anderson Plaza <br /> Decatur, IL 62523 <br /> RE: CITY OF DECATUR <br /> City Project#�-03 �`�-��7 <br /> GARFIELD AVENUE BRIDGE REHABILITATION <br /> Dear Mr. Nooden: <br /> This letter is written in response to our meeting on November 29, 2005 regarding the repair of <br /> the Ga�eld Avenue structure. <br /> As discussed, the configuration of the existing pier caps and bearings require the structure be <br /> temporarily supported on either side of the existing piers to be replaced. <br /> During the design process it became apparent the cost for installing and removing the <br /> temporary supports along with rebuilding the concrete corbel bearing system was becoming a <br /> significant portion of the cost of repairs. The cost for these items is estimated to be in the <br /> range of$475,000 to $525,000. <br /> Because of these costs, alternate methods of supporting the structure during repair and <br /> alternate bearing configurations were evaluated. <br /> Consideration was given to making the temporary supports permanent and removing the <br /> existing bearing support assembly and pier. The bridge girders would then be supported <br /> approximately 5 feet either side of the expansion joint. This system would provide substantial <br /> cost savings; however, supporting a bridge in this manner is somewhat unconventional and <br /> would require evaluation of the entire structure to be sure it would work. <br /> Consideration was then given to making the temporary supports permanent, however, <br /> providing additional structural steel framing between supports which would allow the bridge <br /> girders to be supported at the original bearing support locations (see Enclosure 1). This <br /> support method is estimated to cost in the range of$320,000 to $370,000, a savings of <br /> $105,000 to $155,000. <br /> 2623 EAST PERSHING ROAD • P. O. BOX 2910 • DECATUR, IL 62 524-2 97 0 <br /> PHONE: 217/428-0973 • FAx: 217/428-8934 • www.bwcinc.com <br /> � <br />
The URL can be used to link to this page
Your browser does not support the video tag.