My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
R2005-178 APPROVING AGREEMENT AMENDMENT
COD
>
City Clerk
>
RESOLUTIONS
>
2005
>
R2005-178 APPROVING AGREEMENT AMENDMENT
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/7/2015 2:55:14 PM
Creation date
12/7/2015 2:55:13 PM
Metadata
Fields
Template:
Resolution/Ordinance
Res Ord Num
R2005-178
Res Ord Title
APPROVING AGREEMENT AMENDMENT WITH STRAND ASSOCIATES, INC.
Approved Date
12/5/2005
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
- a . <br /> STRAND <br /> ASSOCIATES, INC.m <br /> E N G I N E E F S <br /> 910 West Wingra Drive November 30, 2��5 <br /> Madison,WI 53715 <br /> Phone:608-251-4843 <br /> Fax:608-251-8655 <br /> Mr. Richard Berard <br /> Office Locations City of Decatur <br /> Madison,WI 1 Gary K. Anderson Plaza <br /> Joliet,IL Decatur, IL 62523 <br /> Louisville,KY <br /> Lexington,KY <br /> "'°b'ie,A� Re: Master Plan U date <br /> Columbus, IN p <br /> Lancaster.OH <br /> Indianapolis, IN llear Richard� � <br /> Milwaukee,WI <br /> I have your E-mail describing additional modeling and evaluations the City would like <br /> www.strand.com <br /> included in the Master Plan Update. Let me summarize the decisions made by the City <br /> and list the additional tasks desired. <br /> The decisions made by the City that impact completion of the Update are as follows: ' <br /> 1. The City desires to maintain approximately 50 psi as the minimum pressure in <br /> the system during normal operating conditions. <br /> 2. The existing elevated tanks will not be replaced in the near future, making it <br /> undesirable to replace them with new taller tanks in the next 3 to 5 years. <br /> 3. Ideally, service to the high area in southwest Decatur should be provided by <br /> development of a separate pressure zone downstream of the new south tank. The <br /> south tank overflow elevation will match the overflow elevations of the existing <br /> tanks. <br /> 4. �he City will provide a lis� �f Cuitl.ig c�mr:��ents for in�.usion in th:, fi:.a: r�p�:�. <br /> 5. The modeling figures will be moved to an appendix in the report. <br /> Tasks that you have requested to finalize the Update are listed below: <br /> 1. Revise the extended period simulation demonstrating the performance of the <br /> elevated tanks to fully refill the tanks during a series of maximum days. Revise <br /> the report figures accordingly. <br /> 2. Add an extended period simulation demonstrating the performance of the <br /> elevated tanks over a series of average days. Add the necessary figures to the <br /> report. <br />
The URL can be used to link to this page
Your browser does not support the video tag.