Laserfiche WebLink
I had an asbestos inspector check for asbestos . Upon <br /> checking this site he determined that there was 2,000 <br /> square feet of double transite that had been missed on the <br /> city inspection. Also, when removing this transite there <br /> was an additional 500 square of transite under the roofing <br /> material. Asbestos report being furnished. I am requesting <br /> as additional $6000.00 above the original bid for this <br /> removal. There is a charge of$5000.00 for the first 2000 <br /> square feet of transite. There is a charge of$1000.00 for <br /> the 500 square feet that was discovered later. <br /> Thank you, <br /> Don Roderick <br />