Laserfiche WebLink
Staffing 8 Cost Submittal Homer L.Chastain 8 Associates LLP. <br /> �Basin 1 Sediment Storage 8 Mobilization Site <br /> Ciry of Decatur <br /> HLC Project No.5111 Direct Cost Estimate <br /> 6 Sept'05 $18.00 $2.00 $0.10 $0.32 $40.00 $1.50 $250.00 $10.00 <br /> I:VNunidpalRiee\Cily_of DacaturlSad_Baein_1�Menapemenl�[Lake Decatur Baeln t propoeel ol Sept 8,2006.x1s]hours Hour Each Each Mileage Day Each Day Per Title <br /> Sh@@t <br /> Task No. Item Descriotion Count CADD Pn'ntina Xerox Vehicle Vehicle Stakes 3CP�,S Title Work <br /> 13 Comoile Ph II Construction Plans and Soecifications(Sed.Basin and Mob.Site) <br /> 13.1 Cover Sheet �p 2 <br /> 13.2 Index/General Notes/Summ Quant/Sched Quant 32 2 <br /> 13.3 Typical Sections 2p 2 <br /> 13.4 Status of Utilities 2q �p <br /> 13.5 Alignment,Ties 8 Benchmarks �p g <br /> 13.8 Plan 8 Profile Sheets-1"=50'proposed superimposed over existing 200 24 <br /> 13.7 Outfall Detail Sheet(a3 1"=20' �g 2 <br /> 13.8 Erosion Control Plan(SWPPP) 20 4 <br /> 13.9 Access Site-Site Plan 1"=20' 60 4 <br /> 13.1 Grading Plan 1"=20' 70 10 <br /> 13.11 Miscellaneous Detail Sheets 50 8 <br /> 13.12 Miscellaneous Structural Detail Sheets 10 8 <br /> 13.13 Cross Section Sheets-50 ft Intervals @ 6/sht 300 100 <br /> 13.14 Mobilization Site Pre-Engineered Building Details 40 <br /> 13.15 Mobilization Site Sheet Piling Design and Details 40 <br /> 13.16 Outlet SWcture Headwall(s)and Miscellaneous Structural Details 50 <br /> 13.17 Quantity Calculations 10 50 <br /> 13.18 Estimate of Cost 0 20 <br /> 13.19 Estimate of Time 0 10 <br /> 13.21 Special Provisions/Project Manual 4 � <br /> Item Totals 970 184 180 0 0 0 0 0 <br /> Direct Cost $17,846.00 $17,480.00 $368.00 $18.00 $0.00 $0.00 $0.00 $0.00 $0.00 <br /> 14 Conduct Biddina and Award of Contract <br /> 14.1 Assist City in advertising for bids 0 50 <br /> 14.2 Prepare and issue addenda as needed 8 50 50 <br /> 14.3 Assist City in opening 8 evaluating bids p <br /> 14.4 Assist City in awarding construction contract Q � <br /> Item Totals 8 50 110 0 0 0 0 0 <br /> Direct Cost $219.00 $108.00 $100.00 $11.00 $0.00 $0.00 $0.00 $0.00 $0.00 <br /> 15 Preoare A�olications for and Obtain Reauired Permits <br /> 15.1 Prepare Macon County Zoning Permit 1¢ 1� 2Q <br /> Item Totals 18 10 20 0 0 0 0 0 <br /> Direct Cost $310.00 $288.00 $20.00 $2.00 $0.00 $0.00 $0.00 $0.00 $0.00 <br /> 16 Provide Construction Enaineerina Administration Observation and Lavout Services(Assume 8 month duration) <br /> 18.1 Provide construction engineering administration services 0 300 200 30 <br /> 16.2 Provide construction observation 8 material testing services 0 1000 150 <br /> 16.3 Provide construction layout services 20 20 15 4 <br /> 18.4 Prepare and provide record drawings to client 4� 2Q p <br /> Item Totals 60 300 1240 0 195 0 4 0 <br /> Direct Cost $10,604.00 $1,080.00 $600.00 $124.00 $0.00 $7,800.00 $0.00 $1,000.00 $0.00 <br /> Item Totals 1877 1409 6622 372 223 3 33 59 <br /> Summary of Direct Cost $55,147.88 $33,788.00 $2,818.00 $682.20 $117.18 $8:920.00 $4.50 $8,250.00 $590.00 <br /> ��� � o� 1� <br />