My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
R2005-127 AUTHORIZING PROFESSIONAL SERVICES AGREEMENT
COD
>
City Clerk
>
RESOLUTIONS
>
2005
>
R2005-127 AUTHORIZING PROFESSIONAL SERVICES AGREEMENT
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/8/2015 10:17:57 AM
Creation date
12/8/2015 10:17:55 AM
Metadata
Fields
Template:
Resolution/Ordinance
Res Ord Num
R2005-127
Res Ord Title
AUTHORIZING THE EXECUTION OF PROFESSIONAL SERVICES AGREEMENT FOR LAKE DECATUR SEDIMENT AND WATER STORAGE PROJECT
Approved Date
9/19/2005
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
25
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Staffing 8 Cost Submittal Homer L.Chastain 8 Associates LLP. <br /> Basin 1 Sediment Storage 8 Mobilization Site <br /> City of Decatur <br /> HLC Project No.5111 Direct Cost Estimate <br /> 6 Sept'05 $18.00 $2.00 $0.10 $0.32 $40.00 $1.50 $250.00 $10.00 <br /> I:\Muniapelltiae\CRy_of Decatur�Sed_BaeM_1UAanepemenN[Leke Decatur Baein 1 propoeel ot Sept 8,2005.xb]houro Hour Each Each Mileage Day Each Day Per Title <br /> Sh88� <br /> Task No• Item Descriotion Coun CADD Prin in Xerox V hicle Vehicle Stakes C�PS Title Work <br /> B Public Involvement Phase <br /> 6.1 Team brainstorming session to develop stakeholder issues 2 20 <br /> 6.2 Gather possible stakeholder issues from City,public officials 4 20 <br /> 8.3 Develop strategy and solutions to stakeholder issues 4 20 <br /> 8.4 Prepare exhibits/program for public informational meeting 48 1000 <br />, Assume preparation for 2 meetings 0 <br /> 8.5 Conduct Pre-Public Informational meeting with public officials 24 400 <br />' Assume preparation for 2 meetings 0 <br /> 6.6 Conduct Public Informational Meetings 60 1000 <br /> Assume preparation for 2 meetings 0 <br /> 6.7 Assist City in providing information to the media 2 20 <br /> 6.8 Conduct meetings with local organizations 40 200 600 <br /> 6.9 Receive and evaluate comments from public,organizations 2 <br /> 6.10 Re-evaluate priority of sites and continue land acq process 0 20 <br /> 8.11 Prepare Public Involvement Report with site recommendations 3Q 1�,Q 20 <br /> Item Totals 216 300 3300 0 0 0 0 0 <br /> Direct Cost $4,818.00 $3,888.00 $600.00 $330.00 $0.00 $0.00 $0.00 $0.00 $0.00 <br /> 7 Land Acauisition Phase <br /> 7.1 Provide land acquisition subconsultant with support data Q 6� 12�( <br /> Item Totals 0 80 120 0 0 0 0 0 <br /> Direct Cost $132.00 $0.00 $120.00 $12.00 $0.00 $0.00 $0.00 $0.00 $0.00 <br /> 8 Boundarv Survev (Sedimentation Site) <br /> 8.1 Research 0 <br /> 8.2 Recon&comer recovery 0 40 1 3 <br /> 8.3 Run Boundary 0 5 <br /> 8.4 Calculations 0 10 <br /> 8.5 Final comers 0 10 <br /> 8.8 Download&draft 18 <br /> 8.7 Report 8 Title work-9 parcels Q $ <br />, Item Totals 18 10 10 40 5 1 3 9 <br /> Direct Cost $1,399.10 $324.00 $20.00 $1.00 $12.80 $200.00 $1.50 $750.00 $90.00 <br /> 9 T000 Survev(Sedimentation Sitel <br /> 9.1 Establish Horizontal and Vertical Control 0 <br /> 9.2 Topo site p g g g <br /> 9.3 Download 8 draft 30 10 <br /> 9.4 Field check Q <br /> Item Totals 30 10 0 8 8 0 8 0 <br /> Direct Cost $2,881.89 $540.00 $20.00 $0.00 $1.89 $320.00 $0.00 $2,000.00 $0.00 <br /> 10 T000 and Boundarv Survev(Mobilization Site) <br /> 10.1 Establish Horizontal and Vertical Control 0 <br /> 10.2 Site survey-2 man crew Q 3 days x 10 hrs/day 0 8 1 3 <br /> 10.3 Download&prepare base plan 16 4 4 <br /> Item Totals 16 4 4 6 0 1 3 0 <br /> Direct Cost $1,049.79 $288.00 $8.00 $0.40 $1.89 a0.00 $1.50 $750.00 $0.00 <br /> 11 Se�iment Piceline Easements <br /> 11.1 Route survey-15,000'-2 man crew cQ 15 da 0 15 1 15 <br />' 11.2 Downioad 8 draft 40 30 30 <br /> 11.3 Sketch 8 prepare descriptions-50 parcels 0 60 50 <br /> 11.4 Draft parcels 200 120 120 <br /> 11.5 QA/QC Q §Q � <br /> Item Totals 240 210 210 60 15 1 15 50 <br /> Direct Cost $9,631.40 $4,320.00 $420.00 $21.00 $18.90 $600.00 $1.50 $3,750.00 $500.00 <br /> 12 Ph II Enaineerina Calculations <br />' 12.1 Coordinate detailed geotechnical data prepared by SKS 0 10 <br /> 12.2 Dike and berm design-33,000' 0 4 50 <br /> 12.3 Storm water surface drainage system design-28,000' 0 20 50 <br /> 12.4 Field tile system design-27,000' 0 10 50 <br />' 12.5 Dredge piping system design-15,000' 0 10 50 <br />' 12.6 Retum water system design-16,000',5,500',&18,000' Q � � � <br /> Item Totals 0 54 260 50 0 0 0 0 <br /> Direct Cost $149.75 $0.00 $108.00 $26.00 $15.75 $0.00 $0.00 $0.00 $0.00 <br /> �� c � af l� <br />
The URL can be used to link to this page
Your browser does not support the video tag.