R2005-108 ACCEPTING THE BID AND AUTHORIZING A CONTRACT
COD
>
City Clerk
>
RESOLUTIONS
>
2005
>
R2005-108 ACCEPTING THE BID AND AUTHORIZING A CONTRACT
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/14/2015 10:47:18 AM
Creation date
12/14/2015 10:47:17 AM
Metadata
Fields
Template:
Resolution/Ordinance
Res Ord Num
R2005-108
Res Ord Title
ACCEPTING THE BID AND AUTHORIZING THE EXECUTION OF A CONTRACT MISCELLANEOUS SOUTH SHORES CURB IMPROVEMENTS
Approved Date
8/29/2005
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
. � <br /> WAS CON Co. is the lowest qualified bidder for this project. WAS CON Co. successfully <br /> completed the 2004 sidewalk replacement project for the City and is currently performing <br /> this year's sidewalk project. Staff recommends WAS CON Co. for this project. <br /> This project was developed in response to a growing number of complaints of deteriorating <br /> and hazardous curb and gutter throughout the City. A priority list has been created to <br /> monitor the number and severity of citizen complaints and staff investigations. This list is <br /> very similar to that used to monitor City sidewalks. The locations for the current proj ect <br /> were determined by selecting the most severe curb and gutter for replacement until this <br /> year's funding level was met. The current project is centered in the South Shores area. <br /> Staff desires the ability to be more responsive to the citizens of the City by making a strong <br /> effort to improve the timeliness of necessary curb and gutter replacement / repair. The <br /> ability to issue change orders to the contract to increase the amount of curb and gutter <br /> replacement will improve the overall condition of the City's curb and gutter. <br /> POTENTIAL OBJECTION: There are no known objections to this <br /> resolution and bid award. <br /> INPUT FROM OTHER SOURCES: None <br /> STAFF REFERENCE: Steven Swanson, Director of Engineering & <br /> Infrastructure, 424-2747 <br /> Matt Newell, City Engineer, 424-2747 <br /> Travis Stanley, Civil Engineer I, 424-2747 <br /> The Director of Engineering & Infrastructure, Steven Swanson and City Engineer, Matt <br /> Newell, will be in attendance at the City Council meeting to answer any questions of the <br /> Council on this item. <br /> BUDGET/TIME IMPLICATIONS: <br /> Funding for this project is currently budgeted in the City's Street Capital Improvements <br /> Fund. The recommended low bid amount is $39,402.40. The resolution also authorizes <br /> change orders to the contract to a total project cost not to exceed $50,000 for additional <br /> curb and gutter replacement. <br /> The project is scheduled to begin by September, 2005 and should be substantially <br /> completed within 4 months. <br /> Attach: 3 <br /> cc: John Smith, Assistant City Manager far Public Services <br /> Phil Wilhelm, Municipal Services Manager <br /> Doug Nood'en, Assistant City Engineer <br /> Bobby Davidson, Engineering Technician Supervisor <br /> WAS CON Co. <br />, GRS General Contractors, Inc. <br /> Beniach Construction Co., Inc. <br /> Otto Baum Co., Inc. <br /> Page 2 <br />