Project Name: Annual Brick Street Restoration ,
<br /> Engineer's Estimate Otto Baum Company,Inc. Beniach Construction Co.,Inc.
<br /> Project Number: 05-15 1788 Hubbard Avenue PO Box 20
<br /> Decatur,IL 62526 306-B E.Southline Road
<br /> City Engineering Division Tuscola,IL 61953
<br /> Bid Date: Friday,July 22,2005
<br /> Time: 10:00 A.M.
<br /> Fund: Street Capital
<br /> Organization Code: 45484516
<br /> Object Code: 460710
<br /> Item Pay Item QTY Unit Unit Price Total Unit Price Total Unit Price Total
<br /> Number
<br /> 1 BRICK PAVEMENT PATCHING,TYPE I 80 SY $140 $11,200.00 $153.74 $12,299.20 $205.00 $16,400.00
<br /> 2 BRICK PAVEMENT PATCHING,TYPE II 410 SY $135 $55,350.00 $142.64 $58,482.40 $160.00 $65,600.00
<br /> 3 BRICK PAVEMENT PATCHING,TYPE III 60 SY $130 $7,800.00 $137.64 $8,258.40 $150.00 $9,000.00
<br /> 4 BRICK PAVEMENT PATCHING,TYPE IV 120 SY $125 $15,000.00 $133.20 $15,984.00 $140.00 $16,800.00
<br /> 5 BRICK PAVEMENT PATCHING USING EXISTING BRICKS,TYPE I 90 SY $150 $13,500.00 $187.40 $16,866.00 $205.00 $18,450.00
<br /> 6 BRICK PAVEMENT PATCHING USING EXISTING BRICKS,TYPE il 16 SY $145 $23,925.00 $175.94 $29,030.10 $160.00 $26,400.00
<br /> 7 BRICK PAVEMENT PATCHING USING EXISTING BRICKS,TYPE III 20 SY $140 $2,800.00 $170.94 $3,418.80 $150.00 $3,000.00
<br /> 8 BRICK PAVEMENT PATCHING USING EXISTING BRICKS,TYPE IV 100 SY $135 $13,500.00 $166.50 $16,650.00 $140.00 $14,000.00
<br /> 9 COMB CONC CURB AND GUTTER REMOVE AND REPLACE 1,18 LF $35 $41,475.00 $33.97 $40,254.45 $53.00 $62,805.00
<br /> 10 CATCH BASIN TO BE ADJUSTED WITH NEW FRAME AND LID 2 EA $300 $600.00 $666.00 $1,332.00 $600.00 $1,200.00
<br /> 11 ALVE BOX FRAMES TO BE ADJUSTED WITH NEW FRAMES EA $150 $750.00 $333.00 $1,665.00 $300.00 $1,500.00
<br /> �D0000
<br /> OTAL BIDS(AS CORRECTED) ��� $185,900.00� $204,240.35 $235,155.00
<br /> Percent Over Under ENGINEER'S ESTIMATE ����� 9.87% 26.50°/a
<br /> �7_2.z__ � S
<br /> Matthew C. Newell, P.E., City Engineer Date