My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
R2005-68 ACCEPTING THE BID AND AUTHORIZING A CONTRACT
COD
>
City Clerk
>
RESOLUTIONS
>
2005
>
R2005-68 ACCEPTING THE BID AND AUTHORIZING A CONTRACT
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/21/2015 2:33:06 PM
Creation date
12/21/2015 2:33:05 PM
Metadata
Fields
Template:
Resolution/Ordinance
Res Ord Num
R2005-68
Res Ord Title
ACCEPTING THE BID AND AUTHORIZING THE EXECUTION OF A CONTRACT FIRE STATION DRIVEWAY REHABILITATION
Approved Date
6/6/2005
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
f. � <br /> COUNCIL COMMUNICATION FORM <br /> Engineering & Infrastructure Memorandum <br /> NO. 2005-35 <br /> May 31, 2005 <br /> TO: Honorable Ma or Osborne and Ci Council <br /> Y h' <br /> FROM: Steve Garm�City Manager . . � <br />' Stephen Swanson, P.E.,Director of Engineering& Infrastructure <br /> Mathew G Newell, P.E., City Engineer <br /> Douglas R. Nood'en,Assistant City Engineer �/ <br /> SUBJECT: Fire Station Driveway Rehabilitation, City Project OS-09 <br /> SUMMARY RECOMMENDATION: <br />' It is recommended by staff that the City Council approve the attached resolution awarding the <br /> contract for Fire Station Driveway Rehabilitation, City Project OS-09, to Christy—Foltz, Inc., as <br /> the lowest, responsible bidder in the amount of$91,832.00, and that the Mayor be authorized to <br /> execute the contract, and the City Clerk to attest. <br /> BACKGROUND: <br /> Numerous fire station driveways have begun to exhibit general deterioration and have known <br /> safety or access issues. Problems include the following: deterioration and degradation of the � <br /> concrete and bituminous pavements, excessive slope causing fire trucks to scrape, turning and ' <br /> access problems, and ponding water. <br /> The project consists of removing existing driveway pavements, widening, adjustment of slope, ' <br /> and replacement with heavy duty concrete. Additional items include removal and replacement of ' <br /> curb, sidewalk, and storm sewer pipe and structures. The project was advertised May 13, 2005, ' <br /> and bids were opened on May 27, 2005. The results for the letting are as follows: ' <br /> Compared to <br /> Engineer's Est. <br /> Bidder Bid Price Over (-Under) 'i <br /> Engineer's Estimate <br /> Alternate A $102,242.25 ------ � <br /> Alternate B $138,433.50 ------ �I <br /> Christy-Foltz, Inc. � <br /> Alternate A $ 66,702.00 (-34.76%) I <br /> Alternate B $ 91,832.00 (-33.66%) � <br /> Entler Excavating Company, Inc. <br /> Alternate A $ 70,663.00 (-30.89%) <br /> Alternate B . $ 95,703.00 (-30.87%) <br />
The URL can be used to link to this page
Your browser does not support the video tag.