My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
R2015-140 AUTHORIZING LAKE DECATUR DREDGING BASINS 1-4 & OAKLEY SEDIMENTATION BASIN REHABILITATION
COD
>
City Clerk
>
RESOLUTIONS
>
2015
>
R2015-140 AUTHORIZING LAKE DECATUR DREDGING BASINS 1-4 & OAKLEY SEDIMENTATION BASIN REHABILITATION
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/24/2015 8:42:47 AM
Creation date
12/24/2015 8:42:47 AM
Metadata
Fields
Template:
Resolution/Ordinance
Res Ord Num
R2015-140
Res Ord Title
AUTHORIZING LAKE DECATUR DREDGING BASINS 1-4 & OAKLEY SEDIMENTATION BASIN REHABILITATION - GREAT LAKES DREDGE & DOCK CO. CONTRACT PAY ITEM INCREASE
Approved Date
12/21/2015
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DEPARTMENT OF WATER MANAGEMENT <br /> Memorandum No. 2015-21 <br /> December 15, 2015 <br /> TO: Mayor Julie Moore Wolfe and City Council <br /> FROM: Tim Gleason, City Manager <br /> Keith Alexander, Director of Water Management <br /> Jerry Stevens, Engineering Services Coordinator <br /> SUBJECT: Lake Decatur Dredging Basins 1-� & <br /> Oakley Sedimentation Basin Rehabilitation - City Project 2013-14 <br /> Great Lakes Dredge & Dock Co. Contract Pay Item Increase <br /> SUMMARY RECOMMENDATION: <br /> Council adopt the attached Resolution authorizing a Contract Pay Item Increase with Great Lake <br /> Dredge & Dock Co. at a cost not to exceed $250,000. <br /> BACKGROUND: <br /> In February 2014 the City Council authorized a six year $89,254,535.96 Lake Decatur dredging <br /> contract to Great Lakes Dredge & Dock Co. that contained a$250,000 contingency pay item for <br /> alterations, cancellations, extension, deductions and extra work. This pay item amount was <br /> extremely small for such a long term high dollar construction contract and was only 0.28% of the <br /> total contract price. Construction contingencies are project specific and typically vary from 1% <br /> to 10%. <br /> The construction phase of the project began in Apri12014. Since then there have been eleven <br /> contingency pay item change orders as described in the attached "Pay Item XX 101793 Status <br /> Summary". Since Great Lakes Dredge & Dock has been very cooperative in reducing expenses <br /> when possible, some change orders were a cost savings to the City and some were cost increases. <br /> To date, the net increase for these change orders is $120,650.99 above the original contingency <br /> amount of$250,000. <br /> Since the project will not be completed for another four years, it is anticipated that there will be <br /> several more cost increase and cost decrease change orders throughout the project's lifespan. <br /> Therefore it is recommended that the contingency pay item be increased by a cost not to exceed <br /> $250,000. This will increase the contract price by $250,000 from $89,254,535.96 to <br /> $89,504.535.96. The contingency pay item will still be a very insignificant 0.56% of the total <br /> contract price. <br /> POTENTIAL OBJECTION: <br /> None foreseen. <br /> STAFF REFERENCE: <br /> Keith Alexander, Director of Water Management, 217-424-2863 or kalexander@decaturil.gov <br /> Jerry Stevens, Engineering Services Coordinator, 217-424-2833 or jstevens@decaturil.gov <br />
The URL can be used to link to this page
Your browser does not support the video tag.