My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
R2005-54 ACCEPTING THE BID AND AUTHORIZING A CONTRACT
COD
>
City Clerk
>
RESOLUTIONS
>
2005
>
R2005-54 ACCEPTING THE BID AND AUTHORIZING A CONTRACT
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/24/2015 2:34:42 PM
Creation date
12/24/2015 2:34:41 PM
Metadata
Fields
Template:
Resolution/Ordinance
Res Ord Num
R2005-54
Res Ord Title
ACCEPTING THE BID AND AUTHORIZING THE EXECUTION OF A CONTRACT STREET RECONSTRUCTION
Approved Date
5/2/2005
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I I <br /> COUNCIL COMMUNICATION FORM <br /> Engineering& Infrastructure Memorandum <br /> NO. 2005-23 <br />' April 26, 2005 <br /> TO: Honorable Mayor Osborne and City Council <br /> FROM: Steve Garm City Manager ,���/j <br /> Stephen S son, P.E.,Director of Engineerin & Infrastructure �� <br /> Mathew C. N well, P.E., City EngineerG�22%'� <br /> SUBJECT: Street Reconstruction, City Project OS-24 <br /> SUMMARY RECOMMENDATION: <br /> It is recommended by staff that the City Council approve the attached resolution awarding the <br /> contract for Street Reconstruction, City Project OS-24, to Dunn Company, A Division of Tyrolt, <br /> Inc., as the lowest, responsible bidder in the amount of $993,216.35, and that the Mayor be <br /> authorized to execute the contract, and the City Clerk to attest. <br /> BACKGROUND: <br /> The Street Reconstruction Project is structured to provide an improved road base and pavement ' <br /> surface in curbed or non-curbed streets and alleys having existing asphalt that have suffered a <br /> significant loss of structural capacity. Streets proposed for this project have existing pavement that <br /> is badly deteriorated through the combined effects of age and use. These pavements can no longer <br /> be effectively maintained by the City's street crews nor can a standard mill and overlay be applied <br /> with the hope of long term success. An additional goal of the project is to restore any existing curb <br /> and gutter to full function wherever possible. <br /> Street reconstruction work involves the removal of the existing street, the construction of a <br /> stabilized base course and the placement of a new asphalt surface. This work is generally <br /> completed over the course of one week. A listing of the streets included in this year's <br /> reconstruction proj ect is attached for your information. <br /> An additional item that was included as part of this project is the reconstruction of City Parking Lot <br /> #4, which is located between the 100 blocks of West William Street and West Prairie Street (by the <br /> Decatur Club). The work on this lot will provide landscaping, new lighting and a new paved <br /> surface. The general parking layout will remain the same. <br />
The URL can be used to link to this page
Your browser does not support the video tag.