Laserfiche WebLink
COUNCIL COMMUNICATION FORM <br /> Engineering & Infrastructure Memorandum <br /> NO. 2005 -18 <br /> March 24, 2005 <br /> TO: Honorable Mayor Osborne and City Council <br /> FROM: Steve Garman., City Manager � <br /> Stephen Swanson, P. E., Director of Engineering & Infrastructur <br /> Matthew C. Newell, P. E., City Engineer� <br /> SUBJECT: Agreement with URS Corporation <br /> Condit Street Pedestrian Access, City Project 05-06 <br /> SUMMARY RECOMMENDATION: I <br /> Staff recommends that the City Council approve the attached resolution authorizing an <br /> agreement with URS Corporation (URS) for design services for improvements to the Condit <br /> Street sidewalks. The proposed agreement is for a fee not to exceed $22,000.00. <br /> BACKGROUND: <br /> On July 19, 1999, the City Council approved an agreement with WVP Corporation (now URS) <br /> for design services for improvements to the Condit Street sidewalks. The project was postponed <br /> at that time due to the pending improvement of Wabash Crossing. <br /> The proposed design is to raise the south sidewalk through the subway in order to provide better <br /> pedestrian accessibility. Raising the walkway will improve the safety of the sidewalk by further <br /> separating it from street traffic and also by reducing the steep slope present in the existing side- <br /> walk. <br /> The sidewalk is in acute need of replacement at this time due to significant cracking and deterio- <br /> ration. This route will be a major student and pedestrian thoroughfare with the Wabash Crossing <br /> residential development on the west side of the railroad tracks and the new Hope Academy on <br /> the east side. <br /> POTENTIAL OBJECTIONS: There are no known objections to this request. <br />