Laserfiche WebLink
Attachment A to Work Order No.1 <br /> Condit Street Subway;Sidewalk Rehabilitation <br /> 3) The Client has agreed that: <br /> a) The seepage problem onto the abutment breast wall faces will not be addressed in this project. <br /> b) Existing pavement will remain as is except that amount required to be replaced with concrete for the installation <br /> of the new inlets,retaining wall and raised sidewalk on the south side of the road. New concrete will be placed at <br /> the elevation of the existing bituminous surface. <br /> c) No curb ramps are proposed for this project. <br /> 4) Schedule <br /> a) Provide Preliminary Plans(90%Complete)&Preliminary Cost Estimate to City for approval no latter than May 20. <br /> b) Provide Final Plans,Quantities, Cost Estimate&Standard and Supplemental Specifications to City for approval <br /> no latter than June 10. <br /> 5) Payment <br /> URS will provide services for work described under Item(1)on a Time&Materials basis.The fee shall not exceed <br /> 22 000 unless written authorization is obtained from the City.A multiplier of 2.74 will be applied to hourly rates. <br /> Posta e and other ex enses will be reimbursed to R <br /> 9 p U S at the actual cost. <br /> Sheet 2 of 2 <br />