Laserfiche WebLink
Decatur Transfer Hous <br /> e <br /> Feasibility Study � <br /> Change Order No. 2 <br /> April 21, 2005 <br /> This Change Order shall serve as an Amendment to the Agreement befinreen Farnsworth Group, Inc. <br /> (FGI)and the City of Decatur(Client) dated September 20, 2004, and shall become a part of that <br /> Agreement. This Change Order is limited to the scope of services described below. <br /> FGI shall investigate to determine if there is a mural under the current layers of paint on the inside <br /> surface of the Transfer House main roof and, if so, determine if it can be restored. If it is determined <br /> that a mural exists and that it is restorable, an estimate of the cost of restoration will be provided. FGI <br /> may choose to utilize the services of an outside consultant to assist in these services. A written letter <br /> report describing the results of the investigation will be provided. <br /> Compensation for this Change Order shall be based upon hourly charges for professional services plus <br /> reimbursable expenses as set forth in Appendix C of the Agreement. An estimate of the charges for <br /> this Change Order is $2,400 for hourly charges for professional services plus $1,200 for the services of <br /> an outside consultant plus $200 for reimbursable expenses such as mileage, printing and shipping. <br /> The total estimated charges are $3,800. <br /> Farnsworth Group, Inc. City of Decatur, Illinois <br /> . <br /> Signat e Sign re <br /> Steven E: Bishop, AIA, SE Steve Garman <br /> Typed Name Typed Name <br /> Structural Engineerinq Manager City Manager <br /> Title Title <br /> � �.� I�- � ---�_ ATTEST: <br /> Signature <br /> Daniel P. Gavin, AIA <br /> Typed Name City Clerk <br /> Architectural Principal <br /> Title <br /> END OF CHANGE ORDER NO. 2 <br />