My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
R2004-141 AUTHORIZING PROFESSIONAL CONSULTING AGREEMENT
COD
>
City Clerk
>
RESOLUTIONS
>
2004
>
R2004-141 AUTHORIZING PROFESSIONAL CONSULTING AGREEMENT
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/30/2015 9:11:57 AM
Creation date
12/30/2015 9:11:55 AM
Metadata
Fields
Template:
Resolution/Ordinance
Res Ord Num
R2004-141
Res Ord Title
AUTHORIZING PROFESSIONAL CONSULTING AGREEMENT - TRANSFER HOUSE FEASIBILITY STUDY
Approved Date
9/20/2004
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
21
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Decatur Transfer Hous <br /> e <br /> Feasibility Study � <br /> Change Order No. 2 <br /> April 21, 2005 <br /> This Change Order shall serve as an Amendment to the Agreement befinreen Farnsworth Group, Inc. <br /> (FGI)and the City of Decatur(Client) dated September 20, 2004, and shall become a part of that <br /> Agreement. This Change Order is limited to the scope of services described below. <br /> FGI shall investigate to determine if there is a mural under the current layers of paint on the inside <br /> surface of the Transfer House main roof and, if so, determine if it can be restored. If it is determined <br /> that a mural exists and that it is restorable, an estimate of the cost of restoration will be provided. FGI <br /> may choose to utilize the services of an outside consultant to assist in these services. A written letter <br /> report describing the results of the investigation will be provided. <br /> Compensation for this Change Order shall be based upon hourly charges for professional services plus <br /> reimbursable expenses as set forth in Appendix C of the Agreement. An estimate of the charges for <br /> this Change Order is $2,400 for hourly charges for professional services plus $1,200 for the services of <br /> an outside consultant plus $200 for reimbursable expenses such as mileage, printing and shipping. <br /> The total estimated charges are $3,800. <br /> Farnsworth Group, Inc. City of Decatur, Illinois <br /> . <br /> Signat e Sign re <br /> Steven E: Bishop, AIA, SE Steve Garman <br /> Typed Name Typed Name <br /> Structural Engineerinq Manager City Manager <br /> Title Title <br /> � �.� I�- � ---�_ ATTEST: <br /> Signature <br /> Daniel P. Gavin, AIA <br /> Typed Name City Clerk <br /> Architectural Principal <br /> Title <br /> END OF CHANGE ORDER NO. 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.