My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
R2004-128 ACCEPTING BID AND AUTHORIZING CONTRACT
COD
>
City Clerk
>
RESOLUTIONS
>
2004
>
R2004-128 ACCEPTING BID AND AUTHORIZING CONTRACT
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/30/2015 3:36:33 PM
Creation date
12/30/2015 3:36:26 PM
Metadata
Fields
Template:
Resolution/Ordinance
Res Ord Num
R2004-128
Res Ord Title
ACCEPTING BID AND AUTHORIZING CONTRACT - LAGESSE & ASSOCIATES
Approved Date
8/16/2004
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
43
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
B. Standardized Plant Names, American Joint Committee on Horticulture Nomenclature. <br /> 2. PRODUCTS � <br /> 2.01. MATERIALS <br /> Plant material shall be provided to Contractor for his installation. Plants shall be in plugs <br /> or small potted form. <br /> 3. EXECUTION <br /> 3.01. TIME OF OPERATIONS <br /> Planting shall be done when the climatic and soil conditions are appropriate as confirmed <br /> by Owner's Representative. <br /> 3.02. CONDITION OF SITE <br /> A. Site shall have been sprayed with Round-Up or other comparable herbicide a week or I <br /> mare prior to installation. '' <br /> B. Hardwood chips shall have been spread over the area to be planted. <br /> 3.03. PLANTING <br /> A. Excavation for plants shall be done manually or mechanically creating a planting hole <br /> approximately two times the volume of the root ball. <br /> B. Plants shall be set into ground at the height they had been growing, and the loose <br /> excavated soil firmly hand-tamped around the root. <br /> C. Plants shall be spaced and mixed according to plan. <br /> 3.04. Watering <br /> Plants shall be thoroughly watered-in within an hour of their planting. Soil moisture shall <br /> reach a depth of 4-6" below the root ball. <br /> 3.06. CLEAN-UP and FINAL SITE CONDITIONS <br /> The planting bed shall be relatively smooth and uniform in appearance. The site shall be <br /> cleaned of all excess material debris and refu e <br /> , s created during the planting process. All <br /> improvements shall be cleaned as necessary to remove any effects of construction. Any <br /> damage to existing features (roads and parking, streets, trees, etc.) shall be repaired to the <br /> satisfaction of the Owner's Representative. <br />
The URL can be used to link to this page
Your browser does not support the video tag.