My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
R2004-128 ACCEPTING BID AND AUTHORIZING CONTRACT
COD
>
City Clerk
>
RESOLUTIONS
>
2004
>
R2004-128 ACCEPTING BID AND AUTHORIZING CONTRACT
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/30/2015 3:36:33 PM
Creation date
12/30/2015 3:36:26 PM
Metadata
Fields
Template:
Resolution/Ordinance
Res Ord Num
R2004-128
Res Ord Title
ACCEPTING BID AND AUTHORIZING CONTRACT - LAGESSE & ASSOCIATES
Approved Date
8/16/2004
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
43
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
WILDFLOWER PLANTING <br /> DECATUR,ILLINOIS i <br /> DIVISION 2—SITE WORK I� <br /> 1. GENERAL <br /> 1.01. WORK INCLUDES <br /> A. Base Bid <br /> 1. Landscape Contractor provide labor for: <br /> a. Installation of Plant Material as shown on drawing sheets and specified <br /> herein. Work includes,but is not limited to: <br /> 1) Plant plugs and small potted plants <br /> 2) Initial water-in <br /> 1.02. SCHEDULE <br /> Work shall be done starting on or about August 24. Completed on or about August 31. <br /> 1.03. QUALITY ASSUR.ANCE <br /> All work described in this Section is to be done by a firm specializing in such work with <br /> documented 3 years experience in similar work. The personnel of the firm shall be <br /> experienced in the work specified and shall work under the direction of a skilled foreman. <br /> 1.04. PROTECTION � <br /> A. Contractor is responsible to protect and avoid all existing underground utilities during <br /> construction operations. Repair of any utilities damaged by installation shall be the <br /> responsibility of the Contractor. <br /> B. Contractor is responsible to protect all existing conditions trees, shrubs, etc. from damage <br /> during project installation and maintenance. Any damages occurring shall be the <br /> responsibility of the Contractor to replace, repair or compensate Owner for damages. <br /> 1.05. WARR.ANTY <br /> No warrantee is required provided Contractor follow project specifications. <br /> 1.06. REFERENCES <br /> A. U.S.D.A. Standards for Nursery Stock, American Association of Nurserymen. <br />
The URL can be used to link to this page
Your browser does not support the video tag.