My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
R2004-128 ACCEPTING BID AND AUTHORIZING CONTRACT
COD
>
City Clerk
>
RESOLUTIONS
>
2004
>
R2004-128 ACCEPTING BID AND AUTHORIZING CONTRACT
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/30/2015 3:36:33 PM
Creation date
12/30/2015 3:36:26 PM
Metadata
Fields
Template:
Resolution/Ordinance
Res Ord Num
R2004-128
Res Ord Title
ACCEPTING BID AND AUTHORIZING CONTRACT - LAGESSE & ASSOCIATES
Approved Date
8/16/2004
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
43
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
7. PROTECTION OF EXISTING CONDITIONS <br /> A. Contractor shall locate, mark and protect and avoid all existing underground <br /> utilities during construction operations. Repair of any utilities damaged by <br /> construction shall be the responsibility of the Contractor. <br /> B. Contractor shall protect existing improvements including paving, trees and other <br /> vegetation, and other improvements. Contractor shall avoid driving, operating <br /> equipment and storing equipment and materials within rooting zones (drip lines) <br /> of existing trees. Any damaged items shall be repaired or replaced as directed by <br /> Owner. <br /> 8. DELNERY AND STORAGE OF MATERIALS <br /> Plant material shall be stored and protected from dessication and damage to the <br /> satisfaction of the Owner's Representative. <br /> 9. SAFETY AND SECURITY <br /> A. Contractor is responsible for all his equipment, materials and supplies at the site. <br /> B. Contractor is responsible for all safety measures including traffic control as <br /> needed. <br /> C. Contractor shall comply with OSHA regulations. <br /> 10. SITE CONDITIONS AND CLEAN-UP <br /> A. Site shall be kept in a neat and tidy condition during construction operations. At <br /> the end of each day construction materials shall be neatly stacked and covered if <br /> necessary. All trash, debris, and waste materials shall be removed from the site or <br /> placed in Contractor's own trash containers. Dirt shall be cleaned from <br /> surrounding surfaces. <br /> � B. At the end of construction, all trash, debris and waste materials shall be removed <br /> from the site. All existing and new surfaces shall be washed clean of debris, dirt, <br /> and other effects of Contractor's work. <br /> 11. CONTR.ACTOR REQUIRMENTS <br /> The contractor shall at all times during the term of this contract pay the applicable <br /> prevailing wage for Macon County for the month during which the work is performed, as <br /> determined by the Illinois Department of Labor. <br />
The URL can be used to link to this page
Your browser does not support the video tag.