My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
R2004-60 AUTHORIZING THE EXECUTION OF AN AGREEMENT
COD
>
City Clerk
>
RESOLUTIONS
>
2004
>
R2004-60 AUTHORIZING THE EXECUTION OF AN AGREEMENT
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/6/2016 8:12:04 AM
Creation date
1/6/2016 8:12:03 AM
Metadata
Fields
Template:
Resolution/Ordinance
Res Ord Num
R2004-60
Res Ord Title
AUTHORIZING THE EXECUTION OF AN ENGINEERING SERVICES AGREEMENT FOR WATER SYSTEM IMPROVEMENTS - PHASE I
Approved Date
4/19/2004
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of Decatur <br /> STRAND Page 3 <br /> ASSDCIATES, INC.'" ^Y�7 p' ^oo^ <br /> !'11.1 1 O L Y <br /> E N G I N E E R S <br /> 27. Provide Dam Vulnerability Assessment (VA) Improvements that include fence <br /> repairs, door modifications, lighting, and motion detectors. <br /> 28. Provide Lake Decatur Intake VA Improvements that include motion detectors. <br /> 29. Provide Raw Water Pump Station VA Improvements include fence repairs, door <br /> modifications, lighting, and motion detectors . <br /> 30. Provide South Water Treatment Plant VA Improvements that include lighting, ladder <br /> shields, intrusion switches, vent replacements, door modifications, window <br /> modifications, duress switches,vehicle barriers, and fence modifications. <br /> 31. Provide William Street Reservoir and Pump Station VA Improvements that include <br /> lighting, vent replacements, door modifications, and intrusion switches. <br /> 32. Provide Garfield Elevated Tank VA Improvements that include lighting, vent <br /> replacements, hatch replacement, and fence modifications. <br /> 33. Provide Division Street Elevated Tank VA Improvements that include lighting, vent <br /> replacements,hatch replacement, and fence modifications. <br /> 34. Provide Dewitt County Well Field VA Improvements that include door <br /> modifications and lighting. <br /> 35. Provide Lime Sludge Storage Lagoons VA Improvements that include fence repairs, <br /> lighting, and door modifications. <br /> 36. Provide SCADA System VA Improvements that include locked panels, HMI <br /> workstation, software, and hardware. <br /> 37. Provide opinion of probable construction cost. <br /> 38. Prepare and submit permit applications with supporting documentation to IEPA. <br /> Comments received from IEPA will be addressed as required. <br /> 39. Conduct 90 percent design review at Decatur. <br /> 40. Submit final drawings and specifications to Decatur no later than 25 business days <br /> after 90 percent review meeting. A copy of final drawings and specifications will <br /> also be submitted on read/write compact disk. <br /> 41. Assist OWNER win advertisement of PROJECT and distribute drawings and <br /> specifications. <br /> 42. Answer questions from bidders. <br /> SPZ:pII\S:\(c�Sai\601--650\624\031\Wrd\Strand Decatur Agreement.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.