Laserfiche WebLink
COUNCIL COMMUNICATION FORM <br /> Engineering & Infrastructure Memorandum ', <br /> NO. 2004-10 I <br /> February 5, 2004 �� <br /> TO: Honorable Mayor Osborne and City Council ' <br /> FROM: Steve Garman, City Manager <br /> Stephen Swanson, P.E., Director of Engineering & Infrastructure���� <br /> Matthew C. Newell,P.E., City Engineer�,�l <br /> SUBJECT: Kaydon Drive Relief Sewer, City Project 2003-10 <br /> SUMMARY RECOMMENDATION: ' <br /> It is recommended b staff that the Cit Council a rove the attached resolution awardin the <br /> Y Y PP g i <br /> contract for Kaydon Drive Relief Sewer, City Project 2003-10, to HCS Lynch Construction, Inc., ', <br /> as the lowest, responsible bidder in the amount of$34,914.00, and that the Mayor be authorized <br /> to execute the contract, and the City Clerk to attest. ' <br /> BACKGROUND: I <br /> On June 16, 2003, the City Council authorized a contract with BGM Engineering to design a II <br /> relief sewer for the Kaydon Drive area. The purpose of this sewer is to increase the capacity of �, <br /> the main sewer in order to eliminate sewer backups that have plagued area residents. The , <br /> attached location map outlines the proposed project. On October 20, 2003, the City Council I, <br /> authorized a permit with the Norfolk Southern Railroad to allow the proposed relief sewer to be !� <br /> extended under their track. '� <br /> The project plans and specifications were prepared by Engineering Division staff. The project �� <br /> was advertised January 8, 2004, and bids were opened on February 5, 2004. The results for the �I <br /> letting are as follows: <br /> Compared to <br /> Engineer's Est. <br /> Bidder Bid Price Over (;Under� <br /> Engineer's Estimate $ 58,800.00 ----- <br /> HCS Lynch Construction Co. $ 34,914.00 (-40.62%) <br /> Siciliano, Inc. $ 45,886.80 (-21.96%) I, <br /> Entler Excavating Co., Inc. $ 48,930.00 (-16.79%) � <br /> Burdick Plumbing& I <br /> Heating Co., Inc. $ 52,618.00 (-10.51%) <br /> Colclasure, Inc. $ 56,946.00 (- 3.15%) !� <br />