My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
R2004-12 AUTHORIZING AGREEMENT
COD
>
City Clerk
>
RESOLUTIONS
>
2004
>
R2004-12 AUTHORIZING AGREEMENT
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/6/2016 10:34:26 AM
Creation date
1/6/2016 10:34:24 AM
Metadata
Fields
Template:
Resolution/Ordinance
Res Ord Num
R2004-12
Res Ord Title
AUTHORIZING AGREEMENT ILLINOIS COMMERCE COMMISSION WOODFORD STREET / NORFOLK SOUTHERN RAILWAY COMPANY RAIL GRADE CROSSING PROTECTION IMPROVEMENTS
Approved Date
2/2/2004
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
approaches, as stated in Section 2 (e) above. <br /> Section 6 The City is financially able and willing to bear an equitable portion of the <br /> cost for the proposed improvements as may be assigned by the order and indicates this <br /> intent by Resolution attached as Exhibit C. <br /> Section 7 Special Provisions: Public Act 93-0604 (effective November 21, <br /> 2003), which amends 18c-7401 (Safety Requirements for Track, Facilities, and <br /> Equipment) of the Illinois Commercial Transportation Law, requires installation of <br /> temporary STOP signs whenever the Commission authorizes the installation of <br /> automatic flashing light signals and gates at public highway-rail grade crossings. The <br /> temporary STOP signs shall remain in place until the luminous flashing signal or <br /> crossing gate devices have been installed. The rail carrier is responsible for the cost of <br /> the installation and subsequent maintenance of any required temporar�r STOP signs. <br /> The Company shall furnish a written statement with the Director of Processing and <br /> Information, of the Commission's Transportation Bureau, indicating that the temporary <br /> STOP signs have been installed at the Woodford Street grade crossing, if ordered. <br /> The Company and the City shall, at six (6) month intervals from the date of <br /> Commission Order subsequent to this Agreement, submit to the Director of Processing <br /> and Information, Transportation Bureau of the Commission, a written report stating the <br /> progress it has made toward completion of the work herein required. Each progress <br /> report shall include the Commission Order number, the Order date, the project completion <br /> date as noted in the Order, crossing information (inventory number and railroad milepost), <br /> type of improvement, and the name, title, mailing address, phone number, facsimile <br /> number, and electronic mailing address of Company and the City/County employee <br /> responsible for management of the project. <br /> All bills for expenditures authorized for reimbursement from the Grade Crossing <br /> Protection Fund shall be submitted to the Fiscal Control Unit of the Illinois Department of <br /> Transportation's Bureau of Local Roads and Streets, Illinois Department of <br /> Transportation, Central Bureau of Local Roads and Streets, Room 205, 2300 South <br /> Dirksen Parkway, Springfield, Illinois 62764. The Department shall send a copy of all bills <br /> to the Director of Processing and Information, Transportation Division of the Commission. <br /> The final bill for expenditures from each party shall be clearly marked "Final Bill". All bills <br /> shall be submitted no later than twenty-four (24) months from the date of Commission <br /> Order subsequent to this Agreement. The Department shall, at the end of the 24th month <br /> from the Commission Order date, de-obligate all residual funds accountable for <br /> installation cost for this project. <br /> 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.