My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
R2003-190 AUTHORIZING AGREEMENT
COD
>
City Clerk
>
RESOLUTIONS
>
2003
>
R2003-190 AUTHORIZING AGREEMENT
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/6/2016 11:47:49 AM
Creation date
1/6/2016 11:47:49 AM
Metadata
Fields
Template:
Resolution/Ordinance
Res Ord Num
R2003-190
Res Ord Title
AUTHORIZING AGREEMENT BAINBRIDGE, GEE, MILANSKI & ASSOCIATES, INC. WATER DISTRIBUTION MAIN FROM THE SOUTH WATER TREATMENT PLANT TO ELEVATED TANKS
Approved Date
12/15/2003
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
� � I <br /> COUNCIL COMMUNICATION FORM ' <br /> Engineering & Infrastructure Memorandum <br /> No. 2003-73 <br /> November 21, 2003 <br /> TO: Honorable Mayor Osborne and City Council <br /> FROM: Steve Garman, City Manager � <br /> Stephen Swanson, Director Engineering&Infrastructure� <br /> Matthew Newell, City Engineer ti.�c.�uil <br /> Richard Berard,Water Projects Engineer �, <br /> SUBJECT: Water Distribution Main from the South Water Treatment Plant to <br /> Elevated Tanks, City Project 2003-23 <br /> SUMMARY RECOMMENDATION: <br /> It is recommended that Council adopt the attached Resolution authorizing an agreement with <br /> Bainbridge, Gee, Milanski &Associates, Inc., (BGM) to provide engineering services for a route <br /> study and Project Plan to extend a Water Distribution Main from the South Water Treatment <br /> Plant(SWTP)to the Elevated Tanks for a lump sum of$30,000. <br /> BACKGROUND: <br /> In March 2002, the City received a study report from Strand Associates, Inc. entitled "Water <br /> System Master Plan". The report recommends a water main distribution improvement project <br /> consisting in the construction of: (a) a 30" water main from the South Water Treatment Plant to <br /> Garfield Avenue, (b) a 16"water main from the new 30"main to the Division St. Elevated Tank, <br /> and (c) a 16" water main from the new 30" water main to the Garfield Avenue Elevated Tank. <br /> This project is needed to increase pumping capacity of the high service pumps at the SWTP and <br /> reduce significant losses in hydraulic grade throughout the distribution system. The <br /> improvements will also allow the proposed south elevated tank to function well with the existing <br /> elevated tanks and supply pressure in excess of 20 psi for an extended period of time during a <br /> power failure at the SWTP. <br /> BGM will assist City staff in providing a preliminary study to investigate existing features along <br /> the proposed route, identify potential alternative routes, prepare cost estimates and select the best <br /> option. In addition, they will assist City staff with a pre-application for an Illinois Environmental <br /> Protection Agency (IEPA) Loan. At the conclusion of the study, BGM will submit a Project <br /> Plan to be used in the application for an IEPA loan. <br />
The URL can be used to link to this page
Your browser does not support the video tag.