Laserfiche WebLink
Cresthaven Sump Pump Drain Line Extension Engineer's Estimate Otto Baum Company,Inc. Burdick Plumbing& Entler Excavating Co.,Inc. <br /> City Project 2003-13 1788 Hubbard Avenue Heating Co.,inc. 819 N.Sunnyside Rd. � <br /> _ City Engineering Division Decatur,Illinois 728 South Main Decatur,Illinois 62522 <br /> Decatur,Illtnois 62521 <br /> Bid Date.. Thursday September 4,2003 r <br /> ime.. 10:00 a.m. <br /> General Capital Improvements Fund <br /> ACCOUNTNO.:................................................................. 30-42000-909 <br /> ENG.CODE:............................................................................. GC 2003-13 <br /> ITEM PAY ITEM QUANTITY UNIT UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL <br /> NUMBER <br /> 20800150 Trench Backfill 1,100 CY =23.00 525,300.00 525.30 E27,830.00 519.00 520,900.00 523.00 525,300.00 <br /> 25200100 Sodding 2,400 SY 56.00 514,400.00 E6.16 S14,784.00 59.00 S21,600.00 58.00 519,200.00 <br /> 42300200 Portland Concrete Driveway,6 Inch 200 SY s40.00 58.000.00 545.10 59,020.00 530.00 56.000.00 538.00 57,600.00 <br /> 44000200 Driveway Pavement Removal 200 SY s4.00 5800.00 S6.60 51,320.00 53.00 5600.00 S10.00 ;2,000.00 <br /> 44001700 Concrete Curb 8 Gutter Removal 8 Replacement 50 LF =55.00 52,750.00 539.60 51,980.00 528-00 51,400.00 s41.00 52,050.00 <br /> 44004610 Sidewalk Removal&Replacement(Special) 200 SF 57.00 E1,400.00 56.60 51,320.00 55.00 51,000.00 E8.00 51,600.00 <br /> 44207701 Class D,Patches,Type 1,Slnch 40 SY 562.00 52,480.00 5137.50 55,500.00 595.00 S3,800.00 S60.00 52,400.00 <br /> 60100902A Drafn Service Connection Tap 6"x 4" 40 EA ;35.00 51,400.00 5110.00 S4,400.00 5115.00 54,600.00 =75.00 j3,000.00 <br /> 60100902B Drain Service(1.5 Inch and 2 Inch Dlameter) 200 LF 517.50 53,500.00 58.80 51,760.00 515.00 53,000.00 516.00 53,200.00 <br /> 60100915 Pipe Drafn,6 Inch 3,619 LF 517.50 563,332.50 513.20 547,770.80 517.00 561.523.00 520.00 572,380.00 <br /> 60701705 Pipe Drain,6 Inch(Special) 2,095 LF 535.00 573,325.00 531.90 566,830.50 534.00 571,230.00 530.00 562,850.00 <br /> 60101710 Pipe Drain Cleanout 22 EA 565.00 51,430.00 5220.00 54,840.00 ;50.00 51,100.00 5230.00 55,060.00 <br /> 70102620 Traffic Control8�Protection Standard 701507 1 LS E2,000.00 52,000.00 53,300.00 53,300.00 52,974.00 52,974.00 52,000.00 52,000.00 <br /> XX000856 Mailbox Removal&Relceatlon 90 EA =70.00 56,300.00 5110.00 59,900.00 535.00 53,150.00 550.00 54,500.00 <br /> TOTAL BID As Corrected) 5206,417.50 5200,555.30 5202,877.00 5213,140.00 <br /> Percent Over or Under ENGINEER'S ESTIMATE -2.84�0 -1.72% 3.26% <br /> ` �C�� <br /> �-�-�3 <br /> Matthew C.Newell,P.E.,City Engineer Date <br />