My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
R2003-126 AUTHORIZING AGREEMENT
COD
>
City Clerk
>
RESOLUTIONS
>
2003
>
R2003-126 AUTHORIZING AGREEMENT
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/13/2016 8:34:39 AM
Creation date
1/13/2016 8:34:38 AM
Metadata
Fields
Template:
Resolution/Ordinance
Res Ord Num
R2003-126
Res Ord Title
AUTHORIZING AGREEMENT PHILLIP W. COCHRAN CONSULTING ENGINEER DRAINAGE AREA 18 IMPROVEMENTS / KAREN DRIVE
Approved Date
9/2/2003
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
For years, the project area has been plagued by poorly defined drainage ways and ditches that <br /> have not efficiently conducted storm water runoff through and away from the area. Many of the <br /> drainage ways are in back yard areas that are inaccessible to routine City maintenance. <br /> The proposed project will install a storm sewer that will provide more reliable drainage for the <br /> Karen Drive area in order to meet the storm water capacity needs identified in the study. <br /> The Engineering Services Agreement will complete the design of the storm sewer line which <br /> includes the necessary topographical surveying, construction drawings, and project documents. <br /> POTENTIAL OBJECTION: There are no known objections to this agreement. <br /> INPUT FROM OTHER SOURCES: Phillip W. Cochran Consulting Engineer <br /> STAFF REFERENCE: Matt Newell, City Engineer at 424-2747 <br /> The City Engineer, Matt Newell, will be in attendance at the City Council meeting to answer any <br /> questions of the Council on this item. <br /> BUDGET/TIME IMPLICATIONS: <br /> Funding for this project will come from the Letter of Credit Projects Fund. The proposed <br /> agreement is for a fee not to exceed$38,000. <br /> A final design should be completed by early Spring for project construction in Spring / Summer <br /> of 2004. <br /> attach: 3 <br /> cc: John Smith, Assistant City Manager of Public Services <br /> A.J. Krieger, Assistant City Manager <br /> Phil Wilhelm, Municipal Services Manger <br /> Phil Cochran,PWC <br /> Page 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.