My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
R2003-125 AUTHORIZING THE EXECUTION OF TASK ORDER NO.3
COD
>
City Clerk
>
RESOLUTIONS
>
2003
>
R2003-125 AUTHORIZING THE EXECUTION OF TASK ORDER NO.3
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/13/2016 8:36:05 AM
Creation date
1/13/2016 8:36:04 AM
Metadata
Fields
Template:
Resolution/Ordinance
Res Ord Num
R2003-125
Res Ord Title
AUTHORIZING THE EXECUTION OF TASK ORDER NO.3 FOR CONTINUING AGREEMENT FOR ENGINEERING SERVICES
Approved Date
9/2/2003
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
modifications to e�sting utilities, and building modifications, where necessary. The <br /> preliminary cost opinions will not include operating costs for new or e�sting facilities, <br /> costs for new equipment to replace old or worn out equipment, or costs for new pipe <br /> routing or new chlorine feed points unless they are necessary for the proper installation of <br /> the new equipment. <br /> Chlorine Scrubber <br /> Engineer shall evaluate the use of a new chlorine scrubber to remove and treat chlorine <br /> gas resulting from possible future accidental discharge in the existing chlorine feed room. <br /> Engineer shall evaluate both wet and dry type scrubbers. The scrubber will be sized based <br /> on Engineer's interpretation of the applicable codes. <br /> This evaluation will not include any new chlorine feed equipment or modifications to the <br /> e�sting feed equipment. The evaluation will be based on locating the scrubber in the <br /> southwest corner of the basin in place of an existing ammonia storage tank. <br /> This evaluation will include the cost of the scrubber equipment, new duct work, utilities, <br /> removal of the e�sting ammonia storage tank, modifications to the existing building, and, <br /> if necessary, a new scrubber building. <br /> Conversion to Totaltv Vacuum Driven Chlorine Feed Svstem <br /> The existing chlorine feed system operates by withdrawal of liquid chlorine from ton <br /> containers, and includes pressurized liquid chlorine equipment and piping, and pressurized <br /> chlorine gas equipment and piping between the containers and existing vacuum regulators. <br /> Chlorine feed is vacuum driven downstream from the vacuum regulators. <br /> Conversion to a totally vacuum driven feed system would require changing from liquid to <br /> gas withdrawal from the chlorine ton containers. Because gas withdrawal is slower than <br /> liquid withdrawal, gas withdrawal would require two ton containers connected on each <br /> side of th <br /> e automatic switchover e ui ment r <br /> q p ather than�ust one contamer on each side as <br /> is currently operated. Vacuum regulators would be mounted directly on the chlorine ton <br /> container tapping valves to eliminate all pressurized chlorine piping. <br /> Any chlorine leakage that might occur in the vacuum piping would be minimized because <br /> of the negative pressure in the vacuum piping system. <br /> This evaluation will include the cost of the new vacuum regulators and associated <br /> equipment, modifications to the existing chlorine equipment, and utilities. Engineer shall ' <br /> prepare a schematic and layout drawing to show the proposed arrangement of the new <br /> equipment. <br /> Automatic Shutoff Vatve Actuators <br /> A-2 <br /> City of Decatur Task Order No.3 <br /> Rev.07-25-03 <br />
The URL can be used to link to this page
Your browser does not support the video tag.