Laserfiche WebLink
c. CONSULTANT will, if necessary, become familiar with recent <br /> environmental issues, land use and zoning issues in project area. <br />� 2. Site Survey <br /> a. CONSULTANT will visit Project Area <br /> b. CONSULTANT will become familiar with the " Downtown" district and <br /> the primary identified site plan area in general. <br /> c. CONSULTANT will utilize existing photographs and maps to illustrate <br /> findings. <br /> d. CONSULTANT will establish circulation routes and travel corridors. <br /> e. CONSULTANT will identify and record proximity of new sign locations. <br /> f. CONSULTANT will prepare a manual proximity location site plan map. <br /> g. CONSULTANT will prepare summary of key findings. <br /> 3. Guidance Pathways Sign System Conceptual Site Plan <br /> a. CONSULTANT will create signs and information routes which route <br /> vehicles to, within, and through designated areas. <br /> b. CONSULTANT will create signs and information that identify important <br /> areas and provide information regarding parking access. <br /> c. CONSULTANT will use signs in the designed "family of signs" that will <br /> identify signage in the project area. <br /> d. CONSULTANT will incorporate existing information concerning the <br /> � above into its recommendations to improve, add on to, and to suggest <br /> guidelines for consolidating existing signage in close proximity to new <br /> sign locations. <br /> CONTRACT <br /> PAG E 12 <br />