Attachment A <br /> SCOPE OF SERVICES <br /> STUDY FOR DREDGE DISPOSAL AND <br /> OFF-STREAM STORAGE FACILITIES <br /> City of Decatur,Illinois <br /> Description of the Proiect <br /> As part of ongoing efforts to establish and implement plans for increasing the reliability of its current water <br /> supply, the City of Decatur has decided to move forward with two specific activities. First, the City has <br /> decided to proceed with a study of options for construction of an off-stream storage reservoir(OSSR). Off- <br /> stream storage was identified by City staff and the City's Water Resource Advisory Committee as an <br /> attractive option for a significant increase in water supply reliability. An off-stream storage reservoir for the <br /> City would be used to store Sangamon River water captured during high flow periods for gradual release to <br /> Lake Decatur or direct supply to the City's water treatment plant during periods of extended low flow in the <br /> river. <br /> The study of the OSSR concept is intended to define for the City critical design parameters for the facility <br /> (e.g., storage volume required, approximate land area required, preferred configuration, anticipated <br /> operational patterns, estimated construction and operating/maintenance costs) and provide an evaluation of <br /> probable costs and implementation factors for up to three possible locations for siting of the OSSR. These <br /> results will provide City decision-makers with the information required to assess the feasibility of the <br /> concept, and, if appropriate, initiate planning for land acquisition,necessary field investigations and detailed <br /> project design. <br /> The City has also purchased equipment and begun training staff to implement a multi-year dredging program <br /> for Lake Decatur. The dredging program is anticipated to result in the removal of more than 5.5 million <br /> cubic yards of material from the lake bottom, providing a modest near-term increase in the reservoir's <br /> available storage capacity and overall reliable yield. Dredge materials removed from the lake during the <br /> initial phase of the dredging programs (Basin 6) will be pumped to the City's existing dredge disposal site <br /> located east of the lake and north of the Norfolk and Western Railroad. However, the existing site will not <br /> be a feasible location for the discharge of material removed during dredging of the downstream(Big Creek <br /> and Sand Creek) areas of the lake. A new dredge disposal site must be constructed to serve this stage of the <br /> program,currently anticipated to begin in about 2005. <br /> Given that both the future off-stream storage reservoir and the needed dredge disposal facility will require <br /> significant land for construction, the City believes that a joint study of siting options is an efficient way to <br /> advance both projects. This approach provides for an efficient consideration of possible sites for both <br /> projects as well as potential opportunities for coordination of project activities to reduce overall project <br /> costs. The detailed scope of services presented below outlines the specific tasks that will be performed as <br /> part of this study program. <br /> Scope of Services <br /> The Services to be performed by CONSULTANT shall be as follows: <br /> 10 <br /> Consulting Services(CPFF)(Rev. 1-14-2003) <br />