My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
R2003-88 AUTHORIZING THE EXECUTION OF CONSULTING SERVICES AGREEMENT
COD
>
City Clerk
>
RESOLUTIONS
>
2003
>
R2003-88 AUTHORIZING THE EXECUTION OF CONSULTING SERVICES AGREEMENT
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/13/2016 4:20:12 PM
Creation date
1/13/2016 4:20:10 PM
Metadata
Fields
Template:
Resolution/Ordinance
Res Ord Num
R2003-88
Res Ord Title
AUTHORIZING THE EXECUTION OF CONSULTING SERVICES AGREEMENT ADDITIONAL RAW WATER SUPPLY
Approved Date
6/16/2003
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
24
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
� Interim deliverables to be submitted during the course of the project will include: <br /> • Summary - Basis for Selection of Off-Stream Storage as the Preferred Water Supply Improvement <br /> Option(deliverable from Task 2) i <br /> • Technical Memo - Design Basis for an Off-Stream Storage Reservoir (deliverable from Sub-task ! <br /> 3.4) I <br /> • Technical Memo-Design Basis for a new Dredge Disposal Facility (deliverable from Sub-task 3.5) ' <br /> • Summary—Development of Siting Options (deliverable from Task 4) <br /> • Draft Report Sections-Evaluation of Facility Siting Scenarios,Recommendations and Conclusions <br /> MWH will submit ten (10)copies of each interim deliverable to the City for review and comment. <br /> Following receipt of comments on the facility siting scenario draft report sections,MWH will submit ten <br /> (10)copies of the final feasibility study report to the City of Decatur. <br /> Project Schedule <br /> Interim deliverables and the final feasibility study report for this assignment will be completed according to <br /> the general project schedule outlined below. <br /> Milestone Weeks After Notice <br /> to Proceed <br /> Summary -Basis for Selection of Off-Stream Storage 4 <br /> Technical Memo—Design Basis for Off-Stream Storage Reservoir 8 <br /> Technical Memo—Design Basis for Dredge Disposal Facility 8 <br />' Summary—Development of Siting Options 10 <br /> Draft Report Sections—Facility Siting Scenarios,Conclusions 18 <br /> Final Project Study Report 22 <br /> 15 <br /> Consulting Services(CPFF)(Rev. 1-14-2003) <br />
The URL can be used to link to this page
Your browser does not support the video tag.