� Interim deliverables to be submitted during the course of the project will include: <br /> • Summary - Basis for Selection of Off-Stream Storage as the Preferred Water Supply Improvement <br /> Option(deliverable from Task 2) i <br /> • Technical Memo - Design Basis for an Off-Stream Storage Reservoir (deliverable from Sub-task ! <br /> 3.4) I <br /> • Technical Memo-Design Basis for a new Dredge Disposal Facility (deliverable from Sub-task 3.5) ' <br /> • Summary—Development of Siting Options (deliverable from Task 4) <br /> • Draft Report Sections-Evaluation of Facility Siting Scenarios,Recommendations and Conclusions <br /> MWH will submit ten (10)copies of each interim deliverable to the City for review and comment. <br /> Following receipt of comments on the facility siting scenario draft report sections,MWH will submit ten <br /> (10)copies of the final feasibility study report to the City of Decatur. <br /> Project Schedule <br /> Interim deliverables and the final feasibility study report for this assignment will be completed according to <br /> the general project schedule outlined below. <br /> Milestone Weeks After Notice <br /> to Proceed <br /> Summary -Basis for Selection of Off-Stream Storage 4 <br /> Technical Memo—Design Basis for Off-Stream Storage Reservoir 8 <br /> Technical Memo—Design Basis for Dredge Disposal Facility 8 <br />' Summary—Development of Siting Options 10 <br /> Draft Report Sections—Facility Siting Scenarios,Conclusions 18 <br /> Final Project Study Report 22 <br /> 15 <br /> Consulting Services(CPFF)(Rev. 1-14-2003) <br />