My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
R2003-87 AUTHORIZING THE EXECUTION OF TASK ORDER NO.2
COD
>
City Clerk
>
RESOLUTIONS
>
2003
>
R2003-87 AUTHORIZING THE EXECUTION OF TASK ORDER NO.2
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/13/2016 4:21:25 PM
Creation date
1/13/2016 4:21:24 PM
Metadata
Fields
Template:
Resolution/Ordinance
Res Ord Num
R2003-87
Res Ord Title
AUTHORIZING THE EXECUTION OF TASK ORDER NO.2 FOR CONTINUING AGREEMENT FOR ENGINEERING SERVICES
Approved Date
6/16/2003
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
�� . <br /> ATTACHMENT A <br /> FOR <br /> TASK ORDER NO.2 <br /> FOR <br /> CONTINUING AGREEMENT FOR ENGINEERING SERVICES <br /> Owner: City of Decatur, Illinois <br /> Engineer: Black& Veatch Corporation <br /> Project: Vulnerability Assessment and Emergency Response Plan <br /> Date: <br /> DESCRIPTION OF SCOPE OF SERVICES <br /> The scope of services for Task Order No. 2 shall generally consist of the following: <br /> Engineer shall conduct a vulnerability assessment(VA) of the critical assets located <br /> within the City of Decatur's municipal water system and prepare an Emergency Response <br /> Plan (ERP). The VA shall include a review of applicable water utiliry operating policies <br /> and procedures. The VA and ERP shall comply with the requirements of the Public <br /> Health, Security, and Bioterrorism Preparedness and Response Act of 2002 (P.L. 107- <br /> 188). <br /> Vulnerability Assessment(VA) <br /> The facilities to be reviewed during the VA shall include: <br /> • South Water Treatment Plant. <br /> • Lake Decatur, including the dam, raw water intake, raw water pumping station <br /> and all appurtenances. <br /> • Emergency backup wells and other existing emergency backup water supply <br /> facilities. <br /> • Pumping stations. <br /> • Storage tanks. <br /> • Distribution system. � <br /> • Supervisory Control and Data Acquisition (SCADA) system. <br /> • Lime sludge storage lagoons. <br /> The VA shall be comprised of six (6) basic tasks. <br /> Task 1. VA Kickoff and Orientation Meeting <br /> This task shall consist of a VA project kickoff ineeting and security orientation to be held <br /> with selected members of the Owner's staff. <br /> A-1 <br /> City of Decatur Task Order No.2 <br /> Rev.OS-21-03 <br />
The URL can be used to link to this page
Your browser does not support the video tag.