Laserfiche WebLink
�. <br /> . <br /> � <br /> ATTACHMENT B <br /> FOR <br /> TASK ORDER NO. 1 <br /> FOR <br /> CONTINUING AGREEMENT FOR ENGINEERING SERVICES <br /> Owner: City of Decatur, Illinois <br /> Engineer: Black&Veatch Corporation <br /> Project: South Water Treatment Plant Basin Inspections and Report <br /> Date: <br /> COMPENSATION <br /> For the services described in Attachment A of this Task Order, the Owner agrees to pay <br /> the Engineer a lump sum fee of$11,800. <br /> SCHEDULE <br /> It is understood and agreed that: <br /> 1. Owner shall dewater the basins for inspection before July 1, 2003 and provide <br /> notification to Engineer at least two weeks in advance of Owner's proposed date <br /> for the inspection. <br /> 2. Engineer shall submit a draft copy of the report for Owner's review within two <br /> weeks following the date of the inspection. <br /> END OF ATTACHMENT B <br /> B-1 <br /> City of Decatur SWTP Task Order No. 1 <br /> Rev.OS-12-03 <br />