My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
R2003-86 AUTHORIZING THE EXECUTION OF TASK ORDER NO.1
COD
>
City Clerk
>
RESOLUTIONS
>
2003
>
R2003-86 AUTHORIZING THE EXECUTION OF TASK ORDER NO.1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/13/2016 4:22:29 PM
Creation date
1/13/2016 4:22:28 PM
Metadata
Fields
Template:
Resolution/Ordinance
Res Ord Num
R2003-86
Res Ord Title
AUTHORIZING THE EXECUTION OF TASK ORDER NO.1 FOR CONTINUING AGREEMENT FOR ENGINEERING SERVICES
Approved Date
6/16/2003
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ATTACHMENT A <br /> FOR <br /> TASK ORDER NO. 1 <br /> FOR <br /> CONTINUING AGREEMENT FOR ENGINEERING SERVICES <br /> Owner: City of Decatur, Illinois <br /> Engineer: Black &Veatch Corporation <br /> Project: South Water Treatment Plant Basin Inspections and Report <br /> Date: <br /> DESCRIPTION OF SCOPE OF SERVICES <br /> The scope of services for Task Order No. 1 shall generally consist of the following: <br /> 1. Perform a visual inspection of one primary basin and one secondary basin at the <br /> South Water Treatment Plant. The inspection shall be performed after the basins <br /> have been dewatered by Owner's staff. The inspection shall consist of visual <br /> observation of all of the visible features of the basins including basin equipment, <br /> piping, and concrete surfaces. Owner shall supply ladders and other forms of <br /> access as Engineer may require to perform a thorough inspection of otherwise <br /> inaccessible areas. The inspection shall be performed in a single 8-hour period by <br /> a three-person team consisting of two of Engineer's staff plus a representative <br /> from the existing basin equipment manufacturer(Ondeo-Degremont). <br /> 2. Prepare a written letter report(approximately 10 pages or less)to communicate to <br /> Owner a summary of the Engineer's observations during the inspection, the <br /> Engineer's recommendations for repairs to the basins and basin equipment, and <br /> the Engineer's opinion of probable costs for the recommended repairs. Engineer <br /> shall initially submit three copies of a draft letter report for Owner's review. <br /> Following receipt of Owner's comments, Engineer shall prepare and submit one <br /> copy of Engineer's final letter report. <br /> 3. Engage the services of a representative from the existing basin equipment <br /> manufacturer (Ondeo-Degremont) to assist with the inspection and report for the <br /> existing basin equipment. <br /> END OF ATTACHMENT A <br /> A-1 <br /> City of Decatur SWTP Task Order No. 1 <br /> Rev.OS-12-03 <br />
The URL can be used to link to this page
Your browser does not support the video tag.