My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
R2003-83 AUTHORIZING EXECUTION OF AGREEMENT
COD
>
City Clerk
>
RESOLUTIONS
>
2003
>
R2003-83 AUTHORIZING EXECUTION OF AGREEMENT
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/13/2016 4:26:00 PM
Creation date
1/13/2016 4:26:00 PM
Metadata
Fields
Template:
Resolution/Ordinance
Res Ord Num
R2003-83
Res Ord Title
AUTHORIZING EXECUTION OF AGREEMENT WITH BAINBRIDGE, GEE, MILANSKI & ASSOCIATES, INC. KAYDON DRIVE RELIEF SEWER
Approved Date
6/16/2003
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 2 <br /> The main sewer serving the Kaydon Drive area has very little excess capacity. The line was <br /> placed very flat and flows nearly half full during low flow periods. Even minor storm water <br /> infiltration into the line severely taxes the system causing sewage overflows. The ultimate <br /> solution to the ongoing problem is to provide a relief sewer to divert excess flows out of the <br /> system. <br /> The proposed agreement includes determining the best location for a relief sewer, designing the <br /> line, preparing plans and specifications. BGM will make application to the Sanitary District of <br /> Decatur and the Illinois Environmental Protection Agency for extension of the relief line and will <br /> submit the necessary paperwork to the railroad for a crossing easement. <br /> BGM is a very competent and respected local firm in the field of sanitary sewer design. <br /> Experience has shown that they will provide an excellent design of the Kaydon Relief sewer. <br /> They have performed numerous sewer related projects for the City in a very satisfactory manner. <br /> BGM is currently studying the Ridgeway sewer system for the City. <br /> POTENTIAL OBJECTION: There are no known objections to this agreement. <br /> INPUT FROM OTHER SOURCES: None <br /> STAFF REFERENCE: Matt Newell, City Engineer at 424-2747 , <br /> The City Engineer, Matt Newell, will be in attendance at the City Council meeting to answer any <br /> questions of the Council on this item. , <br /> BUDGET/TIME IMPLICATIONS: '' <br /> Funding for this project will be taken from the Sewer Fund. The proposed agreement is for a fee I� <br /> not to exceed$9,400. <br /> A final design should be received from BGM within 4 months. i� <br /> attach: 3 <br /> cc: John Smith, Assistant City Manager of Public Services <br /> Phil Wilhelm, Muncipal Services Manager <br /> Charles Hunsinger, Bainbridge, Gee, Milanski &Associates, Inc. <br />
The URL can be used to link to this page
Your browser does not support the video tag.