Laserfiche WebLink
C H R I S T Y • F O L T Z • I N C • B U I L D E R S <br /> 7 4 0 S O U T H M A I N S T R E E T � D E C A T U R • I L L I N O I S • 6 2 5 2 5 <br /> P. O. B O X 8 2 8 A R E A C O D E 2 1 7 • 4 2 8 - 8 6 0 1 <br /> February 26, 2003 <br /> Mark Wilson <br /> Black & Veatch <br /> 8400 Ward Parkway <br /> Kansas City, Missouri 64114 <br /> Re: City of Decatur— SWTP <br /> Siand-By Generator Addition <br /> Preliminary Change Order�,To. 4 Revised <br /> Gentlemen: <br /> We propose to provide all material, labor, equipment, insurance and ap�licable to taxes to <br /> complete the work as outlined in Preliminary Change Order No. 4, including the revisions per <br /> the Engineer, for the sum of$11,818. Included below is a cost breakdown of the work items. <br /> ITEM SUB. MATL SUB. LABOR SUB OH & P TOTAL <br /> Pipe Insulation $1,100 $2,360 Included $3,460 <br /> HeatTrace $3,784 $2,994 $1,017 $7,795 <br /> Sub Total = $11,255 <br /> GC Mark-up = $ 563 <br /> Total = $11,818 <br /> Please contact our office should you have any questions regarding this matter. <br /> Respectfully Submitted, <br /> CHRISTY-FOLTZ, INC. <br /> � � <br /> � � � <br /> Mitchell . Schinzle , P.E. <br /> cc: Rav 1VIcDannell - SWTP <br /> ����,o,� <br /> J' �L�, <br /> �A C� <br /> 0�MEp��> <br /> S\cicy of Decattir\swtp\prelim c.o.-4 Rev <br />