My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
R2003-11 ACCEPTING BID
COD
>
City Clerk
>
RESOLUTIONS
>
2003
>
R2003-11 ACCEPTING BID
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/14/2016 11:46:01 AM
Creation date
1/14/2016 11:46:00 AM
Metadata
Fields
Template:
Resolution/Ordinance
Res Ord Num
R2003-11
Res Ord Title
ACCEPTING BID 4MC CORPORATION - FUELING STATION CANOPY
Approved Date
1/21/2003
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
� / <br /> � O � � � � <br /> 8040 Jordan Road • Argenta, IL 62501 <br /> 217-795-4416 • Fax:217-795-4423 <br /> PAUL McCAANCY <br /> MASS TRANSIT ADIVIIl�IISTRATOR <br /> DECATUR PUBLIC TRANSIT SYSTEM <br /> 555 E.WOOD STREET <br /> DECATUR,IL,62523 <br /> PROPOSAL= NEW 35'X 15' CANOPY PER PRINTS FURNISHED WITH THLS BID <br /> CANOPY SPECIFICATIONS <br /> CLEARANCE= 14'-6" <br /> SUBSET=12" <br /> i COLiJMNS=2- 12"XI2" <br /> COLOR=COLUMNS=VV�IITE,FASCIA WHITE <br /> FASCIA=24" <br /> DECK 167"• 22 G{A.WHITE <br /> COLVLVIIJ-M 1 —3�4 c� <br />' DRAINS=.#2 WITH COLLECTOR EXTERNAL <br /> WII�ID WALL 8'X24'-]0'> <br />' CANOPY WITH ERECTION FREIGHT&TAX'S $11,306.OQ <br /> LABOR AND MATERIAL <br /> TO SAW CUT AND REMOVE CONCRETE <br /> EXCAVATE#2 CANOPY FOOTING 6'X 6'X 6' <br /> PORE NEW CONCRETE FOOTINGS. SET CANOPY BOLTS&STEEL <br /> REMOVE LIGHT POLE&CONCRETE TOP OF OLD LIGHT BASE <br /> PORE BACK CiIRBS 8c SIDEWALK <br /> RELOCATE EXLSTING BUII.,DING TO THE SOUTH 54,900.00 <br /> PAINTING CANOPY #2 COLUMNS WHIT� 5250.00 <br /> LIGHTING #3 SCOTTSDALE CANOPY LIGHTS FOR DETAILS SEE CUT SHEET S 717.00 <br /> ELECTRICAL <br /> REMOVES OLD&RUN NEW ELECTRICAL TO BUII..DING <br /> RUN NEW CONDUTT TO CANOPY INSTALL NEW GAS SHUT OFF <br /> INSTALL#3 NEW CANOPY LIGHTS $1�600,pp <br /> SUPERVISION $1200 00 <br /> TOTAL $19,973.00 <br /> ORPORATION DECATUR PUBLIC TRANSIT SYSTEM <br /> DICK LOGUE PAUL McCHANCY <br /> DA'TE: 11/1/02 DATE : <br /> NOTE:FOOTIIIG SOIL EXECS TO STAY ON SITE DO TO POSSIBLE CONTANIINATION_ <br /> ALL PERMTTS BY OWNER <br /> ALT:PRICE FOR #2 DECAI,AT T�TIlVIE OF INSTALLATION OF CANOPY CI.EARANCE 14'-6" 5130.00 <br />
The URL can be used to link to this page
Your browser does not support the video tag.