My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
R2002-172 AUTHORIZING THE EXECUTION OF SUPPLEMENTAL AGREEMENT NO.2
COD
>
City Clerk
>
RESOLUTIONS
>
2002
>
R2002-172 AUTHORIZING THE EXECUTION OF SUPPLEMENTAL AGREEMENT NO.2
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/14/2016 3:19:33 PM
Creation date
1/14/2016 3:19:32 PM
Metadata
Fields
Template:
Resolution/Ordinance
Res Ord Num
R2002-172
Res Ord Title
AUTHORIZING THE EXECUTION OF SUPPLEMENTAL AGREEMENT NO.2 LAKE DECATUR BASIN 6 STORAGE SITE ENGINEERING SERVICES
Approved Date
9/16/2002
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
TEFtMINATION �I <br /> ; T�is agreement may be terminated by either party within three days after receiving written notice. Any termination � <br /> shall only be for good cause such as for legal, unavailability of adequate financing or major changes in the work. <br /> In the event of any termination, the Engineer will be paid for all services and expenses rendered to the date of ', <br /> termination on a basis of the Schedule of Rates plus reimbursable expenses and reasonable termination costs. ' <br /> DELIVERABLES AND ELECTRONIC FILES ' <br /> Plans, specifications, and electronic files are instruments of service and remain the property of the Engineer. <br />� Sealed hardcopy mylar plans provided by the Engineer are actual deliverables and have precedence over any <br /> electronic files supplied to the Owner as a convenience. Electronic files are supplied in the software format <br /> currently in use by the Engineer, who has no control over deterioration or functional obsolescence due to upgraded <br /> versions of software programs. Owner agrees to indemnify and hold Engineer harmless from claims resulting <br /> from unauthorized reuse of electronic files or unauthorized changes made by Owner or others to files in the <br /> Owner's possession. Information contained in electronic files is valid only for 60 days following delivery to the <br /> Owner, and the Engineer is not responsible for data deterioration within the file. <br /> REUSE OF DOCUMENTS <br /> All documents including drawings and specifications furnished by Engineer pursuant to this Agreement are , <br /> instruments of his services in respect of the work. They are not intended or represented to be suitable for reuse I <br /> by Owner or others on extensions of this work, or on any other work. <br /> ESTIMATES OF COST I <br /> Since the Engineer has no control over the cost of labor, materials or equipment or over a Contractor(s) methods ' <br /> of determining prices, or over competitive bidding or marketing conditions, his opinions of probable Project Cost or , <br /> Construction Cost that may be provided for herein are to be made on the basis of his experience and qualifications � <br /> and represent his best judgment as a design professional familiar with the construction industry, but Engineer !, <br /> cannot and does not guarantee that proposals, bids or the construction cost will not vary from opinions of probable ', <br /> cost prepared by him. If the Owner wishes greater assurance as to the Construction Cost, he shall employ an � <br /> independent cost estimator. I,I <br /> 4 <br /> C:\Documents and Settings\gfoltz\Local Settings\Temporary Internet Files\OLK7\4572 Supp 2 Contract.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.