My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
R2002-149 ACCEPTING THE BID AND AUTHORIZING A CONTRACT
COD
>
City Clerk
>
RESOLUTIONS
>
2002
>
R2002-149 ACCEPTING THE BID AND AUTHORIZING A CONTRACT
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/14/2016 4:25:08 PM
Creation date
1/14/2016 4:25:02 PM
Metadata
Fields
Template:
Resolution/Ordinance
Res Ord Num
R2002-149
Res Ord Title
ACCEPTING THE BID AND AUTHORIZING THE AWARD OF A CONTRACT SEDIMENT STORAGE FACILITY & DREDGE MOBILIZATION SITE CONSTRUCTION
Approved Date
8/5/2002
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
77
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
KOESTER <br /> C O N T R A C T I N G c o R r. "AN EMPLOYEE OWNED COMPANY" <br /> • 14649 Highway 41 North <br /> Evansville, Indiana 47725 <br /> www.koesterco.com <br /> 812-867-6635 <br /> FAX 812-867-2302 <br /> November 12, 2002 <br /> Chastain& Associates, LLP <br /> 5 N. Country Club Road <br /> Decatur, IL, 62521 <br /> Attn: Mr. Don Sheffer, P.E. <br /> RE: Lake Decatur Basin#6 Sediment Storage Facility <br /> Change Order No. 3 —Delete Aggregate Surface Course for Sediment Storage <br /> Facility Staging Area and revise the Access Road Profile Crrade. <br /> Dear Sir, <br /> As requested, we have reviewed the changes associated with deleting the aggregate <br /> surfacing of the staging area at the Sediment Storage Facility and revising the profile <br /> • grades of the access road. These items will be adjusted at the established unit prices from <br /> the Schedule of Values. <br /> 1.) The entire 2,000 sq. yard staging area is deleted. <br /> 2.) The revisions to the profile grade of the access road resulted in a net reduction of <br /> 815.98 cys. of fill from the original design volume. <br /> 3.) It was necessary for us to add back 194.16 cys of earthwork to account for the 3- <br /> inch stripping of vegetation that will be required before we can place the geotextile <br /> fabric and crushed stone base. <br /> 4.) We had to add the additional stone and fabric for the 70-foot road e�ension to <br /> connect with Angle Crossing Road. <br /> Therefore, we are offering a credit in the amount of$10,265.00 for this change. <br /> If you have any questions or comments in regards to this matter, please feel free to contact <br /> me at 812-868-6335. <br /> Sincerely, <br /> %�%� ����uu�i� <br /> Rick I. Niehaus, P.E. <br /> Senior Project Manager <br /> • Cc: File <br /> Attachments: As Noted <br /> GA,A�7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.