My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
R2002-149 ACCEPTING THE BID AND AUTHORIZING A CONTRACT
COD
>
City Clerk
>
RESOLUTIONS
>
2002
>
R2002-149 ACCEPTING THE BID AND AUTHORIZING A CONTRACT
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/14/2016 4:25:08 PM
Creation date
1/14/2016 4:25:02 PM
Metadata
Fields
Template:
Resolution/Ordinance
Res Ord Num
R2002-149
Res Ord Title
ACCEPTING THE BID AND AUTHORIZING THE AWARD OF A CONTRACT SEDIMENT STORAGE FACILITY & DREDGE MOBILIZATION SITE CONSTRUCTION
Approved Date
8/5/2002
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
77
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
. <br /> • • • _ . <br /> LAKE DECATUR BASIN#6 <br /> CHANf3E ORDER NO.3 <br /> DElETE PROPOSED AOOREOATE SURFACE COURSE fOR SEDIMENT STORAOE FACILITY STAOINO AREA <br /> and REVISE THE ACCESS ROAD PROFILE ORADE. <br /> KOESTER CONTRACTINO CORP. <br /> NOVEMBER 12,2002 <br /> SUMM�RY ORI6INAL <br /> Origina Inal svisad Qucntity <br /> BidItsm Bid Dsscription Units Q�►�tY Unit Prica Bid Total Q��tY 4+antity Changa Priu Chaigs <br /> 5 *PARIQN6l.OT SYS 2,000 $ 4.90 $ 9.800.00 2000 0 -2000 $ (9,800.00) <br /> 23 **ACCE55 ROAD EARTNWORK-DELETE EARTHWORK CY 3,900 $ 1.75 $ 6,825.00 3900 3084.02 -815.98 $ (1,427.9� <br /> 27 ***STONE BASE-SE�.OISP AREA-EXTEN�ROA�70' TON 1,850 $ 15.20 $ 28,120.00 18�0 1891 41 $ 623.20 <br /> 23 ****STRIP VE6ETATION-ADD EARTHWORK CY - $ 1.75 $ - 0 194.16 194.16 $ 339.77 <br /> ------------ ----------- <br /> $ 44,745.00 CREDIT = $ (10,265.00) <br /> Notes: *DELETE ENTIRE PARIQN6 LOT AT ESTABLISHED Ut�IIT PRICE FROM SCHEDULE OF VALUES. <br /> **�EI.ETE EARTHWORK FILL QUANTITY FROM STA.56+50 TO STA.73+27.41 AT ESTABLISHED UMIT PRICE FROM SCHEDULE OF VALUES. <br /> ***EXTEND ACCE55 ROAD 70 FEET-12'X 70'@ B INCHES OF STONE=41.00 TONS OF EXTRA STONE 6�FILTER F�BRIC REQUIRED AT ESTABLISH@D UNIT PRICE. <br /> *'*"NEW ITEM-STR�VE6ETATION FROM STA 56+50 TO STA.73+97.41.=1,747.41 LFT.�12' WIDE �3"DEEP= 194.16 CYS. <br /> This Charge Ordsr is erMirsly basad upon tha�it prices given in the Contract Schadule of Volues. <br />
The URL can be used to link to this page
Your browser does not support the video tag.