My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
R2002-133 AUTHORIZING EXECUTION OF AGREEMENT
COD
>
City Clerk
>
RESOLUTIONS
>
2002
>
R2002-133 AUTHORIZING EXECUTION OF AGREEMENT
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/15/2016 11:41:51 AM
Creation date
1/15/2016 11:41:50 AM
Metadata
Fields
Template:
Resolution/Ordinance
Res Ord Num
R2002-133
Res Ord Title
AUTHORIZING EXECUTION OF AGREEMENT BAINBRIDGE, GEE, MILANSKI & ASSOCIATES, INC., DESIGN SERVICES FOR THE KAYDON DRIVE - IMBODEN DRIVE SANITARY SEWER STUDY
Approved Date
7/15/2002
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
,� ��. <br /> , � <br /> AGREEMENT FOR ENGINEERING DESIGN SERVICES <br /> FOR THE <br /> CITY OF DECATUR <br /> KAYDON DRIVE - IMBODEN DRIVE SANITARY EWER STUDY <br /> TffiS AGREEMENT, made and entered into this � �� day of 2002, by and <br /> between the CITY OF DECATUR, ILLINOIS, hereinafter re ed t the "CIT'Y," and <br /> BAINBRIDGE, GEE, MILANSHI & ASSOCIATES, INC., 1670 S th Taylorville Road, <br /> Decatur, Illinois 62521, hereinafter referred to as the "ENGINEER," covers professional <br /> I engineering services in connection with the preparation of a sewer infiltration and inflow study <br /> hereinafter refened to as the "PROJECT". <br /> Said Project has been designated CITY PROJECT and includes the study of excess flow <br /> in a part ofthe South Shores Neighborhood which sewers are tributary to manhole at the intersection <br /> of Medial Drive and Medial Court. <br /> THEREFORE, in consideration of these premises and of the mutual covenants herein set forth: <br /> THE ENGINEER AGREES: <br /> 1. To perform the following engineering services in a phased approach. <br /> a. Conduct flow and level monitoring of 4 key manholes to determine dry and wet <br /> weather flows. The flow meters sha11 be furnished by others. <br /> b. Record rainfall over the flow monitoring period to correlate increases in sewer flow <br /> with wet weather. <br /> c. Smoke test the sewers in the study area to locate inflow points. <br /> d. Estimate base line flow, peak infiltration rates and peak inflow rates. <br /> e. Calculate sewer capacity form City records. <br /> f. Review the recent videotapes of the sewers and summarize the condition of the <br /> sewers. <br /> g. If found to be needed, estimate the cost of a sewer rehabilitation progam and project <br /> the reduction in infiltration and inflow. <br /> h. Compare the cost of UI removal to the cost of transporting and treating the added <br /> flow at the sewage treatment plant. The transport and treat alternative will include <br /> ways to increase sewer capacity. <br /> i. Summarize our findings in a short report and recommend a program to eliminate <br /> sewer backups in the study area. <br /> BGM 02-059 ENG AGREE - 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.