Laserfiche WebLink
�i <br /> July 2,2002 AEX 2886c <br /> APPENDIX A <br /> NEW CENTRAL PARK FOUNTAIN <br /> DECATUR, ILLINOIS <br /> CHANGE ORDER NO. 2 <br /> 1 . Provide all work, materials, and insurance to furnish and <br /> install a new 4" PVC DWV vault drain line independent of <br /> the fountain drain line. Include work, materials, and <br /> insurance for a backwater valve at the existing manhole to <br /> indude all fittings, coring the manhole, and backwater <br /> valve. �' $2,586.00 <br /> 2. Provide changes relating to pipe sizes as shown on the <br /> shop drawings submitted by Hydro-Dramatics. The 10" <br /> pressure PVC pipe shown on the shop drawings was <br /> reduced to 8" pressure PVC pipe. � $1 5,272.00 <br /> 3. Provide for the credit issued on June 7, 2002 by Hydro- <br /> Dramatics as stated in a letter from HydroDramatics (Anne <br /> Gunn) to Christy-Foltz (Larry Bafford). � ($4,500.00) <br /> 4. Provide remote electrical switching as shown on drawings <br /> CO2.1 - Electrical Plan and CO2.2 - Switch Box and <br /> Schematics. ` $1 ,81 7.00 <br /> 5. Provide all work and materials to reconnect power to the <br /> north Central Park outlets per drawing CO2.1 . � $2,287.00 <br /> TOTALS �$17,462.00 <br /> K:\28xx\2886c\CO2 02_07_03.doc <br />