My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
R2002-121 AUTHORIZING THE EXECUTION OF CHANGE ORDER NO.2
COD
>
City Clerk
>
RESOLUTIONS
>
2002
>
R2002-121 AUTHORIZING THE EXECUTION OF CHANGE ORDER NO.2
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/15/2016 12:06:56 PM
Creation date
1/15/2016 12:06:55 PM
Metadata
Fields
Template:
Resolution/Ordinance
Res Ord Num
R2002-121
Res Ord Title
AUTHORIZING THE EXECUTION OF CHANGE ORDER NO.2 CENTRAL PARK FOUNTAIN
Approved Date
7/1/2002
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
�i <br /> July 2,2002 AEX 2886c <br /> APPENDIX A <br /> NEW CENTRAL PARK FOUNTAIN <br /> DECATUR, ILLINOIS <br /> CHANGE ORDER NO. 2 <br /> 1 . Provide all work, materials, and insurance to furnish and <br /> install a new 4" PVC DWV vault drain line independent of <br /> the fountain drain line. Include work, materials, and <br /> insurance for a backwater valve at the existing manhole to <br /> indude all fittings, coring the manhole, and backwater <br /> valve. �' $2,586.00 <br /> 2. Provide changes relating to pipe sizes as shown on the <br /> shop drawings submitted by Hydro-Dramatics. The 10" <br /> pressure PVC pipe shown on the shop drawings was <br /> reduced to 8" pressure PVC pipe. � $1 5,272.00 <br /> 3. Provide for the credit issued on June 7, 2002 by Hydro- <br /> Dramatics as stated in a letter from HydroDramatics (Anne <br /> Gunn) to Christy-Foltz (Larry Bafford). � ($4,500.00) <br /> 4. Provide remote electrical switching as shown on drawings <br /> CO2.1 - Electrical Plan and CO2.2 - Switch Box and <br /> Schematics. ` $1 ,81 7.00 <br /> 5. Provide all work and materials to reconnect power to the <br /> north Central Park outlets per drawing CO2.1 . � $2,287.00 <br /> TOTALS �$17,462.00 <br /> K:\28xx\2886c\CO2 02_07_03.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.