My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
R2002-121 AUTHORIZING THE EXECUTION OF CHANGE ORDER NO.2
COD
>
City Clerk
>
RESOLUTIONS
>
2002
>
R2002-121 AUTHORIZING THE EXECUTION OF CHANGE ORDER NO.2
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/15/2016 12:06:56 PM
Creation date
1/15/2016 12:06:55 PM
Metadata
Fields
Template:
Resolution/Ordinance
Res Ord Num
R2002-121
Res Ord Title
AUTHORIZING THE EXECUTION OF CHANGE ORDER NO.2 CENTRAL PARK FOUNTAIN
Approved Date
7/1/2002
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
. f <br /> 2 0 0 0 E D I T I O N <br /> AIA DOCUMENT G701-2000 <br /> Change Order <br /> (Iristructioris on reverse side) <br /> PROJECT: CHANGE ORDER NUMBER: G-2 OWNERx❑ <br /> (N��mc und uddresc) <br /> New Fountain for Decatur Central Park DATE: ,1Uly 3, 2002 ARCHITECT ❑ <br /> CentralPark ARCHITECT'S PROJECT NUMBER: 2$$6C CONTRACTORx❑ <br /> pe�ur II 62523 CONTRACT DATE: Jaf1Ua�/Z, ZOQZ FIELD ❑ <br /> TO CONTRACTOR: CONTRACT FOR: Getle�"dI�IVO(jC OTHER ❑ <br /> (Name and address) <br /> Christy-Foltz,Inc. <br /> 740 S.Main St. <br /> Decatur il 62521 <br /> THE CONTRACT IS CHANGED AS FOLLOWS: <br /> (Include,wher ap �c ble,mry und'puted amoiu�t trihutable to rev usl exec d Constn on i r es <br /> Prov�c�e a`�o� a��a�ate�r�a�`s to cc�`�e�e �i�e ��� �L��rR'�'€��' �n Appendix A <br /> dated 7u7y 3, 2fl�2 and attache�i to this C��ge order, and d�scr�bed in <br /> drawings �o2.i and CO2.2. <br /> TOTAL ADD 517,462.00 <br /> The original(Contract Sum)( was$ ' ' <br /> The net change by previously authorized Change Orders$ $g'���'� <br /> The(Contract Sum) (��•---~'��a "�--•=---- -- ^--=--)prior to this Change Order was g 461,972.00 <br /> The(Contract Sum) ( will be(increased)(deerease� <br /> f�by this Change Order in the amount of$ 1��d62•fl0 <br /> The new(Contract Sum) ( including this Change Order will be g 4'79,434:00 <br /> The Contract Time will be(-_-___�__'; ;_'____�:__'; (unchanged)by Unehanged � 0 )days. <br /> The date of Substantial Completion as of the date of this Change Order therefore is Unchanged <br /> NOTE:This Change Order does not include changes in the Contract Sum,Contract Time or Guaranteed blasimum Price which <br /> have been authorized by Construction Change Directive for which the cost or time are in dispute as described in Subparagraph <br /> ;.3.8 of AIA Document Azoi. <br /> Not valid until signed by the Architect,Contractor and Owner. <br /> ,�,�c�;,t,ec�,a���s;vas,L.L.P. Christy-Foitz,Inc. City of Decatur � <br /> A R C H I T E C T (Ty�ed name) C O N T R A C T O R (Typed name) O W N E R (Typed name) ``�//,� <br /> � ' ���_ <br /> Halde Schinzler, Jr. •�����• <br /> (Signaturc) (Signati c) L (Signature) - <br /> Lawrence R.Livergood � • 0 2 0 0 o A I A O <br /> / AIA DOCUMENT G701-2000 <br /> g July 3,20�2 BY BY <br /> CHANGEORDER <br /> July 10, 2002 <br /> DATE DATE DATE <br /> �02000 The American Institute of Architects.Reproduction of the material herein or substantial quotation of its The American Insiitute <br /> provisions without written permission of the AIA violates the copyright laws of the United States and will subject of Architecis <br /> the violaTor to legal prosecution. 1735 New York Avenue, N.W. <br /> WARNING:Unlicensed photocopying violates U.S.copyright laws and will subject the violator to legal prosecution. Washington, D.C.20006-5292 <br />
The URL can be used to link to this page
Your browser does not support the video tag.