My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
R2002-119 AUTHORIZING EXECUTION OF AGREEMENT
COD
>
City Clerk
>
RESOLUTIONS
>
2002
>
R2002-119 AUTHORIZING EXECUTION OF AGREEMENT
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/15/2016 3:31:34 PM
Creation date
1/15/2016 3:31:33 PM
Metadata
Fields
Template:
Resolution/Ordinance
Res Ord Num
R2002-119
Res Ord Title
AUTHORIZING EXECUTION OF AGREEMENT - CSX TRANSPORTATION, INC. - 44TH STREET & U.S. ROUTE 36
Approved Date
7/1/2002
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
23
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
upon approach or presence of a train. CITY, at its sole expense,will terminate its cable at junction box <br /> and configure the preemption circuit with its system whereby a failure will not cause an unsafe <br /> condition in the opinion of RAILROAD. <br /> SECTION 3. All required installation work at the R.AILROAD'S preemption circuit in <br /> accordance with the plans approved by the parties pursuant to this Agreement, related railroad <br /> protective services (including flagmen and watchpersons), and preliminary and construction <br /> engineering design and review, in connection with the Project, shall be performed with its own forces <br /> or its contractors. RAILROAD shall indicate in its estimate the items of work to be accomplished <br /> under such contract or contracts and list in each estimate the names of each contractor whose services <br /> will be used to perform the work. <br /> CITY shall perform or cause to be performed, at CITY'S sole cost and expense, all other work <br /> in connection with the Project, including the installation of its highway safety traffic system and <br /> related cable up to the RAILROAD'S designated preemption circuit, in accordance with the plans <br /> approved by the parties pursuant to this Agreement. All work performed by CITY and its contractors <br /> or consultants within the vicinity of or upon the property of RAILROAD shall be conducted subject <br /> to the instructions of RAILROAD, in accordance with its safety and operations policies, practices, <br /> rules and regulations. No work shall be performed by CITY or its contractors on RAILROAD <br /> property without the prior approval of RAILROAD. <br /> SECTION 4. The RAILROAD will not begin to work without written authorization from the <br /> CITY to proceed. Upon receipt of authorization, the RAILROAD shall promptly begin the work set <br /> forth in this Agreement. <br /> SECTION 5. CITY sha11 reimburse RAILROAD for all of the costs incurred by R.AILROAD <br /> for work on the project to be performed by RAILROAD, in accordance with the cost criteria set forth <br />
The URL can be used to link to this page
Your browser does not support the video tag.