�. - <br /> ESTIMATED COST TO COMPLETE NEW CENTRAL PARK FOUNTAIN <br /> AE's Est.Final <br /> Fountain Element Negotiated Fountain Comments: <br /> Contract project Cost <br /> Amount <br /> Original Base Bid 455,962 NA <br /> Revised Base Bid(Contract Amount) NA 403,277 <br /> Adjustments to Base Bid: <br /> • Modifications to construction (22,000) 0 No change to final cost. <br />� sequence and footing design <br /> • Remove landscape (14,000) 15,900 <br /> • Remove demolition and backfill (21,500) 6,845 City crews have completed this work. <br /> • Change fountain system cost 7,315 0 No change to final cost. <br /> • Change in plumbing cost 2,000 0 No change to final cost. <br /> • Eliminate performance bond (4,500) 0 No change to final cost. <br /> • Change Order for pipe size 0 10,772 HydroDramatics agreed to a$4,500 credit <br /> changes made by towards pipe size changes. <br /> HydroDramatics <br /> • Remote switching for fountain 0 1,817 <br />, • Reconnecting North Park outlets 0 2,366 , <br /> Ad'usted Contract Amount 403 277 440,977 <br /> 1 . <br /> Bid Alternates that should be Included: ' <br />� • Sewer Replacement 25,100 4,186 Includes City's cost of$1,599.26 for sewer <br />� related work. <br /> • Sidewalk Replacement 53,544 35,744 <br /> • Park Seating 8,716 8,529 <br /> • Sidewalk Lighting 7,500 14,422 <br /> Adjusted Contract Amount with the 498,137 503,858 <br /> Altemates <br /> Other Project Costs: <br /> • AE Design costs 37,600 51,093 <br /> • Outside Consultant cost 10,360 0 <br /> • AE Reimbursables 3,166 0 <br /> • Construction Observation 15,000 15,000 Work performed by AE. <br /> Total Estimated Project Cost 564,263 569,951 <br /> (Revised 6-26-02) <br /> Page 3 <br />