June 26, 2002 <br /> ENGINEERING & INFRASTRUCTURE MEMORANDUM I <br /> NO. 2002 - 46 I� <br /> MEMORANDUM TO: Honorable Mayor and City Council <br /> FROM: Steve Garman, City Manager <br /> Stephen Swanson P. E., Director of Engineering & Infrastructure� <br /> SUBJECT: Central Park Fountain <br /> SUMMARY RECOMMENDATION: <br /> It is recommended by City staff that the City Council approve the attached resolution <br /> authorizing a change order in the amount of$17,541.00 to the contract with Christy-Foltz for the <br /> construction of the new Central Park Fountain. <br /> BACKGROUND: <br /> Architectural Expressions has advised City staff of the final change order to the contract with <br /> Christy-Foltz for the construction of the new Central Park fountain. The change order includes <br /> four work items. <br /> The first item is the change in pipe sizes that was made necessary because of specifications <br /> provided to Architectural Expressions by HydroDramatics for the fountain's pumping system. <br /> The pipe sizes bid were undersized and had to be increased from 4-inch and 6-inch diameter <br /> pipes to 8-inch diameter pipe. The increase in pipe size caused an increase in the cost for <br /> � pipe, pipe fittings, trenching, bedding and the labor and equipment to install the larger diameter <br /> pipes. Architectural Expressions has negotiated with HydroDramatics to obtain a $4,500 credit <br /> from HydroDramatics for its mistake. This net increase to the contract amount after applying <br /> the credit for this item, including the credit amount, is $10,772.00. <br /> The second item is the decision to add a remote switch to operate the fountain in addition to the <br /> switch in the pump vault. This will facilitate turning the fountain off and on when maintenance <br /> needs to be done or if the sound from the fountain interferes with an event in Central Park. If <br /> this switch is not added, it would require a confined space entry each time the fountain needed <br /> to be turned off and on. City staff considers this to be a necessary feature to add to the <br /> fountain project. The work involves additional wiring and switching to be installed between the <br /> pump vault and the Central Park band shell storage room. The total amount for this item is <br /> $2,586. <br /> The third item is additional electrical wiring and conduit that needs to be installed to reconnect <br /> electrical outlets near North Park Street. These outlets had to be disconnected because of the <br /> construction work associated with the new fountain and must be restored to service. This work <br /> was not included in the contract with Christy-Foltz. The total amount for this work is $2,366.00. <br /> Page 1 <br />