Knollwood Drive Street Reconstruction Engineer's Estimate Entler Excavating Co.,In Christy-Foitr,Inc. Otto Baum Co.,Inc. GRS General Contractor Ciem's Excavating,Inc.
<br /> CP2001-34 819 N.Sunnyside Rd. 740 S.Main Street 1788 Hubbard Ave. 2440 Hulette Lane 3275 Longcreek Rd.
<br /> ALTERNATE No 2(P.C.C.PAVEMEN'n ity Engineering Divisio Decatur,IL 62522 Decatur,IL 62521 Decatur,IL 62526 Decatur,IL 62521 Decatur,IL 62521
<br /> Bid Date.. Tuesday,May 21,2002
<br /> Time.. 10:00 a.m.
<br /> General Capital Improvements
<br /> ObjectCode.............................................................................. 30�1000-624
<br /> ACCOUNT NO. :................................................................. 30-41000-624
<br /> ENG.CODE:............................................................................. CP2001-34
<br /> ITEM PAY ITEM QUANTITY UNIT UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL
<br /> NUMBER
<br /> 20100210 TREE REMOVAL(OVER 15 UNIT,r,DIAMETER) 42 UNIT $30.00 $1,260.00 $50.00 32,100.00 $22.00 $924.00 $40.15 $1,686.30 $19.00 $798.00 $30.24 $1,270.08
<br /> 25200100 SODDING 800 SQ YD $10.00 $8,000.00 $5.50 a4,400.00 $5.50 $4,400.00 $5.43 $4,344.00 $5.47 $4,376.00 $5.40 $4,320.00
<br /> 20800250 TRENCH BACKFILL,SPECIAL 46 CU YD $20.00 $920.00 $25.00 $1,150.00 $16.00 $736.00 $23.87 $1,098.02 $18.00 $828.00 $16.74 $770.04
<br /> 30200300 PROCESSING LIME MODIFIED St�ILS 8" 1,521 SQ YD $6.90 $10,494.90 $6.30 $9,582.30 $7.00 $10,647.00 $6.24 $9,491.04 $6.90 $10,494.90 $6.21 $9,445.41
<br /> 30201500 LIME 30 TON 555.00 51,650.00 $55.00 $1,650.00 $52.00 $1,560.00 a32.55 $976.50 $61.40 $1,842.00 $53.35 $1,600.50
<br /> 35100100 AGGREGATE BASE COURSE,TYPE A 70 TON $23.00 $1,610.00 $25.00 $1,750.00 $25.00 $1,750.00 $17.90 $1,253.00 $15.00 $1,050.00 $18.36 $1,285.20
<br /> 42000100 PORTLAND CEMENT CONCRETE PAVEMENT 6" 1,521 SQ YD S27•00 $41,067.00 $25.00 $38,025.00 $30.00 545,630.00 $26.85 $40,838.85 $42.90 565,250.90 $37.41 $56,900.61
<br /> 42300200 PORTLAND CEMENT CONCRETE DRIVEWAY,6 INCH 170 SQ YD $34.70 $5,899.00 $29.00 34,930.00 $33.00 $5,610.00 $35.26 $5,994.20 $42.90 $7,293.00 $99.41 $16,899.70
<br /> 42400200 PORTLAND CEMENT CONCRETE SIDEWALK 5 INCH 2,265 SQ FT $3.50 $7,927.50 $3.75 $8,493.75 $4.00 $9,060.00 $3.26 $7,383.90 54.00 $9,060.00 $4.97 $11,257.05
<br /> 42400300 PORTLAND CEMENT CONCRETE SIDEWALK 6 INCH 752 SQ FT $3.70 $2,782.40 �4.25 $3,196.00 $3.50 $2,632.00 $3.42 E2,571.84 $4.25 $3,196.00 $4.92 $3,699.84
<br /> 440001000 PAVEMENT REMOVAL 1,521 SQ YD E10.75 516,350.75 $10.00 �15,210.00 $9.00 $13,689.00 $11.72 $17,826.12 $10.80 $16,426.80 $8.94 $13,597.74
<br /> 44000200 DRIVEWAY PAVEMENT REMOVAL 170 SQ YD a9.60 a1,632.00 $5.00 $850.00 $9.00 $1,530.00 $14.32 $2,434.40 $8.80 $1,496.00 $5.40 $918.00
<br /> 44000300 CURB REMOVAL 36 FOOT $2.00 $72.00 $10.00 $360.00 $2.50 590.00 $8.25 $297.00 $3.00 $108.00 $8.64 $311.04
<br /> 44000500 COMBINATION CURB AND GUTTER REMOVAL 843 FOOT $3.35 �2,824.05 $2.00 a1,686.00 $3.00 $2,529.00 $4.34 $3,658.62 $3.50 $2,950.50 $5.08 $4,282.44
<br /> I 44000600 SIDEWALK REMOVAL 2,802 SQ FT $2.50 $7,005.00 $1.00 52,802.00 $1.00 $2,802.00 $1.79 $5,015.58 $1.00 $2,802.00 $1.62 $4,539.24
<br /> 550B0010 STORM SEWER,CLASS B,TYPE 1,4" 60 FOOT $20.00 $1,200.00 $12.00 $720.00 $15.50 $930.00 $13.02 $781.20 $22.00 $1,320.00 $15.12 $907.20
<br /> 55060050 STORM SEWER,CLASS B,TYPE 2 12" 27 FOOT $18.00 $486.00 $21.00 $567.00 $34.00 $918.00 $23.87 $644.49 $26.00 $702.00 $33.48 $903.96
<br /> 55060090 STORM SEWER,CLASS B,TYPE 1 18" 262 FOOT $28.50 $7,467.00 a25.00 $6,550.00 $36.50 $9,563.00 $34.72 $9,096.64 $32.00 $8,384.00 $36.18 $9,479.16
<br /> 55060090 STORM SEWER,CLASS B,TYPE 1 18"WATER MAIN 60 FOOT $50.00 $3,000.00 $39.00 $2,340.00 $58.00 $3,480.00 a45.57 $2,T34.20 $31.50 $1,890.00 $57.24 $3,434.40
<br /> QUALITY
<br /> 55060380 STORM SEWER,CLASS B,TYPE 2 18" 194 FOOT $30.00 $5,820.00 $25.00 $4,850.00 $36.50 $7,081.00 $34.72 $6,735.68 $32.00 $6,208.00 $36.18 $7,018.92
<br /> 60101605 PIPE UNDERDRAINS 4"(SPECIAL) 85 FOOT $15.00 $1,275.00 $15.00 $1,275.00 36.00 $510.00 $13.02 $1,106.70 $30.00 $2,550.00 $5.40 $459.00
<br /> 60218400 MANHOLES,7'1'PE A,4'DIAMETER,TYPE 1 FRAME, 1 EACH $1,500.00 $1,500.00 $1,200.00 $1,200.00 $1,400.00 $1,400.00 $2,007.25 $2,007.25 $2,250.00 52,250.00 $1,350.00 $1,350.00
<br /> CLOSED LID
<br /> 60235700 INLETS,TYPE A,TYPE 3 FRAME AND GRATE 1 EACH $650.00 �650.00 $800.00 a800.00 $625.00 $625.00 $759.50 $759.50 $478.40 $478.40 $621.00 $621.00
<br /> 60240385 �NLETS,TYPE B,TYPE 3 WITH SPECIAL FRAME AND 6 EACH $950.00 �5,700.00 $950.00 �5,700.00 $1,125.00 $6,750.00 $1,030.75 36,184.50 $748.90 �4,493.40 $1,107.00 $6,642.00
<br /> GRATE
<br /> 606d3500 COMBINATION CONCRETE CURB AND GUTTER,TYPE 36 FOOT $20.00 $720.00 $17.00 $612.00 $19.00 $684.00 $27.13 $976.68 $14.00 $504.00 $35.59 $1,281.24
<br /> B-6.06
<br /> 60604400 COMBINATION CONCRETE CURB AND GUTTER,TYPE �3 FOOT $20.00 $16,860.00 $17.00 $14,331.00 $19.00 316,017.00 $20.07 $16,919.01 $22.00 a18,546.00 �37.08 $31,258.44
<br /> B-6.18
<br /> 70103700 TRAFFIC CONTROLL 1 L SUM a5,000.00 $5,000.00 �2,000.00 52,000.00 $2,500.00 $2,500.00 $2,712.50 $2,712.50 $1,000.00 $1,000.00 $540.00 $540•00
<br /> 81012600 CONDUIT IN TRENCH,2"DIA,PVC 52 FOOT $20.00 $1,040.00 $4.00 5208.00 $19.00 $988.00 $21.17 $1,100.84 $4.40 5228•80 18.36 $954.72
<br /> TOTAL BID As Corrected 0 $160 212.60 $137 338.05 $155 035.00 $156 628.56 $176 526.70 $195 946.93
<br /> Percent Over or Under ENGINEER'S ESTIMATE -14.28% -3.23% -2.24% 10.18% 22.30%
<br /> �f�C�" �v --'Z�j/-CJZ.
<br /> Matthew C. Newell, City Engineer Date