CHANGE ORDER <br /> Order No. 11 <br /> Date: 4/29/2002 �' <br /> Agreement Date: 4/24/2001 <br /> NAME OF PROJECT: SWTP Improvements Nitrate Removal Facility <br /> City Project No. 9953 <br /> OVYNER: City of Decatur, Illinois <br /> CONTRACTOR: Diversified Buiidings, inc. <br /> The following changes are hereby made to the CONTRACT DOCUMENTS: <br /> The change order wiil modify the contract as foAows: <br /> A. Remote Contro/ Camera. Furnish and install a remote control camera (Pelco Spectra II Series <br /> Discreet Dome System, Pendant Mount, Environmental service Model DD56C), a pendant for mounting <br /> the camera on a parapet wall at the southwest comer of the new Nitrate Facility, and the outdoor power <br /> supply. The camera shall be connected to the existing plant CCN system controller and multiplexer <br /> using RG-6/U cable. 7he cable shall be routed in a spare conduit from the Nitrate Facifity to the <br /> Operations Building Main Electric Room then in new '/." GRC conduit from the electric room to the <br /> operations room. Attachments: D81's PCO No. 13 (includes quotes and catalog information on the <br /> camera and accessories). <br /> B. PVC Ridgid Sfee/ Condtrit Install PVC coated rigid steel conduit in lieu of the specified galvanized <br /> rigid conduit for the new power and control circuits in the existing chemical storage and chemical feed <br /> areas of the Operations building. The routing and size of conduits shall be as indicated on the attached <br /> revised drawing sheets H12 and H13. Attachments:D81's PCO No. 14 (includes Modem Electric RFP-18 <br /> and RFP-19); Modem Electric Letter L-015 (includes Modem Electric RFP-18A); and revised Drawing <br /> Sheets H12 and H13. <br /> C. Nftrate Analyrers. !n lieu of the three specified UV-6101 units, fumish and install one UN-3150 <br /> single sample unit with crossflow filter, fitter cleaning system, and raw water sampling pump; one UV- <br /> 3150 and one UV-6101 unit both with eight sample units, for IX facilities. Attaehmenfs:DBI's PCO No. 19 <br /> (includes quotes and cata/og information on the equipment) and 8&V RFP No. 4 dated November 9, 2001 <br /> (includes figur�s C06-�, C06-2, C06-3, and C06-4 and catalog information on the equipmenf). - <br /> D. Feed Pump Pr+essure Switches and Operator ControUPLC Input. Fumish and install pressure <br /> switches on the suction side of the IX feed pumps. The pressure switches will protect the feed pumps <br /> f�om dange�ous operating head conditions by interlocking with the AFDs. Modify the lon Exchange Feed <br /> Pump Control description. Attachments: DBI's PCO No. 20(includes quotes) and 8&V RFP No. 6 dated <br /> January 9, 2002(includes Figures 1, 2, and 3)as mod�ed. <br /> E. F/owmeter and Vau1L Furnish and install a flowmeter vault, tapping saddles, air release valve and a <br /> multi-sensor inserition magnetic flowmeter. Attachments: D81's PCO No. 21 (includes quotes) and B&V <br /> RFP No. 5 dated January 2, 2002(includes Figu►�es 1, 2, 3, 4, and 5) as mod�ed <br /> F. MV Transformers. Complete MV transfoRners in preparation for the future generator. Attachments: <br /> DBl's PCO No. 23{includes quotes). <br /> Justification: <br /> The attached backup data provided by Divers�ed Buildings, Inc.was reviewed and the cost included in <br /> the proposal appears reasonable and justified. <br /> Change Order No. 11 <br /> Page 1 of 2 . <br />