Laserfiche WebLink
Scope of Work <br /> To accomplish the project goals, the ISWS will perform an instrumented, 30-day <br /> aquifer test using Decatur's well #2 at the Cisco well field. The ISWS will dri117-9 <br /> observation wells in the area at optimal locations to collect necessary water level data to <br /> quantify the response of the aquifer to the pumpage. The data collected by the ISGS in <br /> the area will be utilized to assist in the selection of sites. The observation wells will be <br /> outfitted with recorders to monitor water levels during the test. Additional wells may be <br /> monitored using steel tapes by ISWS staff if the data will be beneficial in the analysis of <br /> the results. The effect of the Sangamon River will be quantified by the observation well <br /> data and by the installation of seepage meters in the streambed. <br /> A step test will be conducted for 3 hours to evaluate the pumping capacity and to <br /> test both the equipment and method to be used for the 30 day aquifer test. The well <br /> pump will be turned off for 2 days, then, once any needed changes or adjustments are <br /> made, the well pump will be tumed back on and operated at a constant rate for 30 days. <br /> After 30 days, the pump will be turned off and data on water level recovery will be <br /> collected for an additiona130 days. The modifications to the well head and installation <br /> of a valve will be completed by the Ciry of Decatur prior to the commencement of <br /> pumping. <br /> Project Tasks <br /> The following tasks outline the role of the ISWS: <br /> Task 1: Install seepage meters in the Sangamon River. These meters consist of <br /> bladders attached to cutoff drums which when placed in the streambed can <br /> measure the flow rate of groundwater into or out of the stream. These meters <br /> will be placed in 3-5 locations along the Sangamon River where there are <br /> outcrops of sandy aquifer material. Measurements will be made before and <br /> during the aquifer test. Changes in the river stage will also monitored <br /> Task 2: Modify the outflow for Decatur #2 to permit control of the flow rate. <br /> The ISWS will coordinate the temporary piping changes needed at Decatur#2 for <br /> conducting the aquifer test. The City of Decatur will modify the wellhead for <br /> ISWS use and install a valve for regulating the flow rate from the well. The <br /> ISWS will install the temporary piping to the valve and install the necessary <br /> testing equipment for use m morutoring the flow rate during the test. The ISWS <br /> will work with the land owner to monitor the discharge from the test to avoid any <br /> flooding problems on private property. <br /> Task 3: Identify existing wells that may be candidates for water level <br /> monitoring and identify well logs to be used to evaluate the known geologic <br /> characterization. Water well records are maintained by the ISWS. These data <br /> provide the basis for regional hydrologic and geologic characterizations. To help <br /> ensure that the data are as accurate as possible, each record should be verified in <br /> the field for correct location, well depth, static water level, and use. The <br /> following services will be performed. <br /> Subtask 3.1: Notify public of the project and the intent to monitor several <br /> private wells in study area, and solicit their cooperation. We will contact <br /> the well owners in the vicinity of Decatur #2 and seek their cooperation in <br /> allowing us access to measure their well water levels during the 30-day �, <br />