pumping test. <br /> Subtask 3.2: Prepare maps, logs, and data for field effort. <br /> Subtask 3.3: Verify existence and accuracy of well information. Record <br /> location, well use, static water level, depth, accessibility, pump setting, <br /> average pumpage, and well owner/land owner. <br /> Task 4: Determine locations for observation wells. Two criteria will be used <br /> for selecting drill sites, needs for geologic information and the need for water <br /> level data during the pumping test. The locations will be selected to optimize <br /> these needed information. <br /> Task 5: Test hole drilling. Seven to nine test holes will be drilled and completed <br /> as observation wells. Geologic descriptions of the materials will be completed <br /> and samples will be collected of representative cuttings. A 2-inch PVC <br /> observation well will be installed into each borehole at a specific depth to target <br /> information in a specific aquifer. The wells will be drilled using the ISWS drill <br /> rig and operator. <br /> Task 6: Develop the observation wells. Because the drilling method allow for <br /> viscous fluids to penetrate the aquifer around the borehole, each well will be <br /> pumped until clear of these materials. <br /> Task 7: Install water level measuring devices in observation wells. Recording <br /> water level devices will be placed at several of the observation wells. These <br /> recorders will be started as soon as they are installed to begin collecting <br /> background water level data to identify potential flow trends relevant to the <br /> analysis of the pumping test results. <br /> Task 8: Conduct a step test of Decatur #2. A 3-4 hour step test will be run on <br /> the production well. Rates will be changed at 30 minute intervals, increasing <br /> each step until the well is pumping its maximum rate. The well will be shut <br /> down after the test and allowed to recover for 1-2 days. The information <br /> gathered during the test will be analyzed to determine the well loss coefficient, ', <br /> which can be used to determine the drawdown caused by the well (versus the ' <br /> drawdown due to the hydraulic properties of the aquifer). This testing will <br /> provide an opportunity to test the equipment in use as well as determine if any I <br /> changes are needed prior to running the 30-day test. <br /> Task 9: Conduct the 30-day aquifer test. Pump Decatur #2 at a specified rate <br /> for 30 days. After 30 days of pumping, the well will be shut off and the aquifer <br /> recovery will be measured in the observation wells. If any well interference <br /> problems should occur during the test with a private well, the ISWS will measure <br /> the water level in the affected well and then will determine if the pumping test is <br /> causing an effect. We do not anticipate any problems unless a drought has <br /> occurred prior to the test, in which case the test could be delayed. If a problem <br /> does occur, the City of Decatur and the MVWA will assist the ISWS in resolving <br /> the conflict for the duration of the test. If no solution is feasible, then the test <br /> will be aborted. <br /> Task 10: Download and compile data. All of the information will be <br /> downloaded onto computer and the individual measurements by ISWS staff will <br />