. / <br /> Page 2 <br /> The project specifications were prepared by the Engineering Division. The project was <br /> advertised on March 20, 2002 and bids were opened on April 5, 2002. The results of the letting <br /> are as follows (bid tabulation attached): <br /> Compared to <br /> Engineer's Est. <br /> Bidder Bid Price Over ;Under� <br /> Engineer's Estimate $ 999,540.00 ----- <br /> Kinney Contractors, Inc. $ 673,510.00 (-32.62%) � <br /> Bodine Services, Inc. $ 911,086.00 (_ g.g5%) � <br /> GM Sipes Construction, Inc. $ 939,180.00 (- 6.04%) ' <br /> Entler Excavating Co., Inc. $ 947,590.00 (- 5.20%) <br /> A.E.H. Construction, Inc. $ 958,920.00 (- 4.06%) <br /> Memll's Contractors, Inc. $ 989,200.00 (- 1.03%) <br /> Beniach Construction Co. $ 997,651.60 (- 0.19%) <br /> Otto Baum Company, Inc. $1,124,777.40 12.53% <br /> Very good bids were received for this project. Kinney Contractors, the apparent low bidder, was <br /> contacted by the City Engineer and they are certain of their bid and of their ability to perform the <br /> requested work. The Illinois Department of Transportation (IDOT), which oversees the <br /> expenditure of Motor Fuel Tax (MFT) funds and the execution of MFT projects, has determined <br /> that Kinney Contractors is qualified to do the work. Kinney Contractors has performed concrete <br /> pavement joint work throughout the State of Illinois for various cities and IDOT. <br /> City staff originally proposed that repair work be completed on 27th Street between William <br /> Street and U.S. Route 36 as part of this project. In preparation of the Engineer's Estimate, it was <br /> determined that it was likely that this street could not be included due to budget constraints. <br /> With the favorable bids received, staff requests authorization to increase the contract by up to <br /> $67,000 to allow 27th Street between William and Rt. 36 to be completed as part of this project. <br /> Following the approval of the Mayor and City Council, the bid tabulation will be forwarded for <br /> the final approval of IDOT in accordance with the rules governing the disbursement of MFT <br /> funds. <br /> POTENTIAL OBJECTION: <br /> While no firm objections have been received, some concerns have been raised that Kinney <br /> Contractors is not affiliated with the AFL-CIO. As with all City projects and MFT projects, <br /> prevailing wages are required of the contractor. IDOT procedures will require a rejection of all <br /> bids if the lowest qualified bidder is not accepted by local authorities. IDOT has confirmed <br /> Kinney Contractors as qualified to perform the required work. <br />