Laserfiche WebLink
Mr. Kevin Meachum <br /> City of Decatur <br /> Page 3 <br /> April 1, 2002 <br /> two inches (2") of cold lay asphalt may be placed and maintained until the <br /> permanent patch is constructed. <br /> 16. Upon completion of all construction or maintenance work on highway I <br /> right-of-way, the Contractor(s) and/or the Applicant shall remove all ', <br /> excess material and restore all turf and terrain to the satisfaction of the i <br /> Department. Such cleanup and repair may consist of backfilling, � <br /> regrading, reseeding, resodding, or any other requirements to restore the � <br /> right-of-way to a condition equivalent to that which existed prior to the <br /> commencement of the project. <br /> I have affixed my signature to two (2) copies of this Letter Permit. If the City is <br /> in agreement with the terms outlined above, please have the Mayor's <br /> signature affixed in the designated area and return one (1) copy to this office <br /> along with an executed copy of the attached Form BT-725. The City may <br /> proceed with the authorized work upon receipt of an approved copy of Form <br /> BT-725 (Traffic Control Authorization Request). <br /> Please direct any questions regarding this matter to our Permits Supervisor, <br /> Mr. Carroll "Lucky" Phillips, at telephone number 217-466-7231. <br /> Sincerely, <br /> !�-d•�G2e�d.� <br /> H. L. Forbes <br /> District Engineer <br /> CDP:jr <br /> Attach. <br /> cc: D. R. White <br /> APF�OVED: I <br /> � � <br /> u, <br /> L <br /> MAYOR, CITY O ECATUR DATE <br /> ATTE S, � <br /> ` / <br /> _---- � ;/� / . <br /> :(. x�-C--� �_�7G �,C G'"�`�� <br /> City Clerk <br />