Laserfiche WebLink
��5 Est.Final <br /> Fountain Element Negotiated Fountain Comments: <br /> . Contract project Cost <br /> Amount <br /> Original Base Bid 455,962 NA <br /> � Revised Base Bid(Contract Amount) NA 403,277 <br /> Adjustments to Base Bid: <br /> • Modifications to construction (22,000) 0 No change to final cost. <br /> sequence and footing design <br /> • Remove landscape (14,000) 8,500 Estimated cost for landscape contrac- <br /> tor to do the work. <br /> • Remove demolition and backfill (21,500) 6,845 City crews have completed this work. <br /> • Change fountain system cost 7,315 0 No change to final cost. <br /> • Change in plumbing cost 2,000 0 No change to final cost. <br /> • Eliminate performance bond (4,500) 0 No change to final cost. <br /> • Change Order for pipe size 0 15,91 S Responsibility for paying for cost <br /> changes made by HydroDramatics increase is being reviewed by AE with <br /> HydroDramatics. <br /> Adjusted Contract Amount 403,277 434,540 <br /> Bid Altemates that should be Included: <br /> • Sewer Replacement 25,100 25,100 Altemate amount shown in final cost. <br /> Actuai City cost should be less. <br /> • Sidewalk Replacement 53,544 53,544 Alternate amount shown in final cost. <br /> Actual City cost should be less if bid <br /> separately. <br /> • Park Seating 8,716 8,716 Alternate amount shown in final cost. <br /> Marginal savings expected if City <br /> purchases and installs benches. <br /> • Sidewalk Lighting 7,500 7,500 Alternate amount shown in final cost. <br /> ' Actual City cost may increase if a <br /> different style of park light is installed. <br /> Adjusted Contract Amount with the 498,137 529,400 <br /> Alternates <br /> Other Project Costs: <br /> • AE Design costs 37,600 51,093 <br /> • Outside Consultant cost 10,360 0 <br /> • AE Reimbursables 3,166 0 <br /> • Construction Observation 15,000 15,000 Work performed by AE. <br /> Total Estimated Project Cost 564,263 595,493 <br /> " At this time, based on the information in the table, the project cost is essentially the same as <br /> estimated in November of last year ($599,673) and represented to the City Council. The final <br /> cost is subject to change as the result of contractor change orders to increase or decrease the <br /> contract amount and actual costs vary from the amounts estimated for additional work items. <br /> Presuming that Mr. Osborne is not successful in securing additional contributions to the <br /> approximately $150,000 he has already collected, the City's portion of the project will be about <br /> $450,000. <br />