My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
R2002-57 ACCEPTING THE BID AND AUTHORIZING THE EXECUTION OF AN AGREEMENT
COD
>
City Clerk
>
RESOLUTIONS
>
2002
>
R2002-57 ACCEPTING THE BID AND AUTHORIZING THE EXECUTION OF AN AGREEMENT
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/19/2016 3:26:22 PM
Creation date
1/19/2016 3:26:21 PM
Metadata
Fields
Template:
Resolution/Ordinance
Res Ord Num
R2002-57
Res Ord Title
ACCEPTING THE BID AND AUTHORIZING THE EXECUTION OF AN AGREEMENT FIRE STATION TRAINING & STORAGE BUILDING
Approved Date
4/15/2002
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
o ELECTRICAL <br /> The electric is a 200-amp single phase overhead service. T'he classroom lighting <br /> will be from fluorescent fi�ures locating along ceiling. Lighting levels are based <br /> at 50 foot-candle. Outlets will be placed every 12' along walls. Empty conduits <br /> and boxes for phone and data lines are included. In truck area, lighting will be <br /> from 8' high output fluorescent fixtures. The fixtures will be placed in three rows <br /> over the trucks and another row along partition wall. Includes twelve 120v outlets <br /> throughout. The exterior of the building shall be lit with five 175-watt metal <br /> halide wall packs,two each on north and west walls, and one on the east wall. <br /> o CONSTRUCTION DOCUMENTS <br /> A complete set of architectural and site drawings will be completed by a licensed <br /> firm. All drawings will be subject to Owners review prior to construction. <br /> o GENERAL CONDITTONS <br /> Includes items needed to complete the project in a professional,timely manner. <br /> Site supervision, construction layout,temporary site office, material storage <br /> trailer, porta-san, dumpster and debris removal,temporary construction power, <br /> winter heat,progress cleaning and final cleaning after completion of project. <br /> Illinois Power Engineering and site work for Gas and Electric. <br /> Cost far the above scope of work$356,017.00 <br /> Alternates I <br /> l. Bonding $ 5,000.00 <br /> 2. Builders Risk Insurance $ 1,000.00 <br /> 3. Underground Electric Service $ 4,000.00 <br /> Sincerely, <br /> John M. Mackling <br /> President <br />
The URL can be used to link to this page
Your browser does not support the video tag.